010Will AI compute run short or long through 2030?
Pack 009 sized the compute AI demand needs to the end of 2027. Here we add the supply side, carry demand to 2030 and compare the two at the end of each year. In our base case the shortage all but closes during 2027, when about 38 GW of new capacity comes online, if power keeps pace with capex. From 2028 demand pulls ahead again: what customers and labs plan to spend on compute grows faster than the power and money for new capacity, and the market ends 2030 21% short. Power and money, not chips, limit what is switched on from 2027; training budgets and capex decide whether, and how far, the market runs short.
Short in 2026, about even at the end of 2027, short again by the end of 2028
Compute installed at the end of each year against compute demanded, as a share of demand. Both are counted in gigawatts of today’s hardware, so a gigawatt installed later counts for more: it does more work. The first bar covers October to December 2026. Choose the demand and supply cases and how far demand runs above supply today: 20% above means supply meets 83% of demand, 17% short.
Needed: gigawatts of that year’s hardware it would take, on top of everything installed before, for supply to meet demand at year-end. A surplus or shortfall carries into the next year.
Data
| Base case, demand 20% above supply today | Q4 2026 | 2027 | 2028 | 2029 | 2030 |
|---|---|---|---|---|---|
| Supply vs demand, year-end | −19% | −1% | −9% | −18% | −21% |
| Utilization at which supply meets demand | 74% | 60% | 66% | 73% | 76% |
| Switched on, GW | 7.4 | 37.9 | 42.9 | 47.2 | 51.3 |
| Needed, GW | 14.2 | 38.3 | 51.3 | 69.7 | 85.8 |
| Supply, GW of today’s hardware | 54 | 168 | 365 | 705 | 1264 |
| Demand, GW of today’s hardware | 66 | 169 | 403 | 856 | 1609 |
| Demand / supply case (demand 20% above supply today) | Q4 2026 | 2027 | 2028 | 2029 | 2030 |
|---|---|---|---|---|---|
| Low demand, low supply | −20% | +26% | +62% | +97% | +146% |
| Low demand, base supply | −15% | +56% | +110% | +164% | +238% |
| Low demand, high supply | −11% | +92% | +192% | +309% | +440% |
| Base demand, low supply | −24% | −20% | −30% | −38% | −43% |
| Base demand, base supply | −19% | −1% | −9% | −18% | −21% |
| Base demand, high supply | −14% | +22% | +26% | +27% | +25% |
| High demand, low supply | −26% | −47% | −66% | −78% | −85% |
| High demand, base supply | −22% | −34% | −56% | −71% | −79% |
| High demand, high supply | −17% | −19% | −39% | −55% | −67% |
What the base case says
Short through 2026. Today’s market is short. One-year H100 rental contracts rose about 40% between October and March and the B200 rental index is up about 28% this year. Every large cloud says demand exceeds what it can supply, and NVIDIA says its supply supports about 70% revenue growth in its year to January 2028, against demand growth nearer 100%. We assume demand at today’s prices runs 20% above what is being served. The fourth quarter adds about 7 GW, mostly Blackwell racks and new TPUs, while inference demand grows about 56% in the quarter, so the year ends 19% short.
2027 brings supply about level with demand. About 38 GW comes online, 60% more than the 24 GW switched on in 2026. Most of it is Vera Rubin racks and Google’s eighth-generation TPUs, plus Blackwell racks delivered late in 2026. Each gigawatt does about 4.6× the inference work of today’s average and 2.2× the training work. Supply grows about 3.1× during the year in compute terms and demand about 2.6×, so by December supply is about level with demand (−1%): 37.9 GW switched on against 38.3 GW needed. Month by month, with last year’s late deliveries switched on first, the market comes within 3 points of balance in September 2027 and stays there until August 2028. That fits Goldman’s view that supply and demand rebalance in the second half of 2027 at the earliest and more likely in the first half of 2028; Amazon expects to be short through 2027. It needs about 38 GW of power in 2027, above the top of our power research’s range: its high case is 30 GW in 2027 and 40 GW in 2028. At that high case, 2027 ends 15% short.
Then demand pulls ahead. In compute terms supply grows 2.2×, 1.9× and 1.8× in 2028–30, and demand 2.4×, 2.1× and 1.9×. Capacity switched on rises only from 43 GW to 51 GW a year, because AI capex grows 11–18% a year on street estimates. Meanwhile what customers spend on inference grows 35–70% a year in our base case, and training budgets keep growing. The market ends 2028 9% short and 2030 21% short. By 2030, 86 GW of new capacity would be needed against 51 GW switched on, because each year’s shortfall carries into the next. Either capex keeps rising faster than analysts expect, or prices rise until demand fits. The demand and supply cases move this a long way; see the controls above and “What tips the balance” below.
From 2027 the chips could outrun power and money
New AI data-center capacity each year that chips, power and money could each support, GW all-in. Chips: what the chipmakers could deliver from the fourth quarter of the year before through the third quarter, at twice their rated power, Epoch AI’s rule for a data center’s total draw. Power: capacity that can be switched on. Money: AI capex divided by the all-in cost of a gigawatt, chips included. The lowest bar is what comes online. Our estimates from the sources below.
Data
| GW all-in, base | 2026 | 2027 | 2028 | 2029 | 2030 |
|---|---|---|---|---|---|
| Chips the industry could switch on | 23.7 | 47.2 | 63.2 | 73.6 | 80.2 |
| Power that can be switched on | 27 | 38 | 46 | 52 | 58 |
| Money: AI capex ÷ cost per GW | 28.9 | 37.9 | 42.9 | 47.2 | 51.3 |
| Comes online (ledger; 2026 is Q4 only) | 7.4 | 37.9 | 42.9 | 47.2 | 51.3 |
| Chips the industry could deliver | 2026 | 2027 | 2028 | 2029 | 2030 |
|---|---|---|---|---|---|
| Low, M H100-equivalents | 28 | 70 | 110 | 145 | 185 |
| Base, M H100-equivalents | 33 | 100 | 170 | 250 | 350 |
| High, M H100-equivalents | 40 | 140 | 240 | 380 | 550 |
| Low, rated GW | 13 | 20 | 25 | 28 | 30 |
| Base, rated GW | 15 | 26 | 34 | 38 | 41 |
| High, rated GW | 17 | 35 | 43 | 47 | 47 |
| Power and money | 2026 | 2027 | 2028 | 2029 | 2030 |
|---|---|---|---|---|---|
| Power, low, GW | 27 | 30 | 33 | 35 | 37 |
| Power, base, GW | 27 | 38 | 46 | 52 | 58 |
| Power, high, GW | 27 | 50 | 70 | 95 | 105 |
| Power, our power research’s central estimate, GW | — | 23 | 28 | 31 | 35 |
| Power, our power research’s high case, GW | — | 30 | 40 | 50 | 60 |
| AI capex, low | — | $1.4T | $1.65T | $1.85T | $2.05T |
| AI capex, base | $1T | $1.4T | $1.65T | $1.85T | $2.05T |
| AI capex, high | — | $1.6T | $2T | $2.5T | $3T |
| All-in $B per GW of IT power, low | — | 65 | 70 | 75 | 80 |
| All-in $B per GW of IT power, base | 45 | 48 | 50 | 51 | 52 |
| All-in $B per GW of IT power, high | — | 39 | 38 | 37 | 36 |
| Comes online, low, GW | 5.8 | 28.0 | 30.6 | 32.1 | 33.3 |
| Comes online, base, GW | 7.4 | 37.9 | 42.9 | 47.2 | 51.3 |
| Comes online, high, GW | 9.1 | 50.0 | 68.4 | 87.8 | 94.0 |
| Delivered by designer, base | 2026 | 2027 |
|---|---|---|
| NVIDIA | 19.5M | 55M |
| Google TPU | 9M | 26M |
| AMD | 2.2M | 10M |
| Amazon Trainium | 1.7M | 5M |
| Huawei, Cambricon | 1M | 1.5M |
Low supply: the low chip path, power additions growing less than 10% a year, and capex buying GW at $65–80B each: 28–33 GW a year. High: the high chip path, SemiAnalysis’s path for power to 2029 (2030 ours), and capex toward NVIDIA’s $3–4T a year by 2030 at $36–39B a GW; the chips cap 2030. Our power research’s own estimates are separate sensitivities; its 2026 is lower, about 16 GW. By designer, 2027 sums to 97.5M; we round the total to 100M.
Supply: chips, power and money
The chips keep coming. Epoch AI counts 11.3M H100-equivalents delivered in the first half of 2026. We estimate 33M for the year, above pack 009’s 24–27M, which extended the first half’s pace: NVIDIA’s guidance implies a much larger second half, with Vera Rubin, rated at 8.8 H100-equivalents a chip, shipping from the fourth quarter. In 2027 the chipmakers could deliver about 100M as Rubin ramps, Google ships its eighth-generation TPUs and AMD its MI455X racks; NVIDIA would be about 56% of that and Google 27%. NVIDIA says supply limits its revenue at least through January 2028, Broadcom expects its AI revenue to double to about $115B in fiscal 2027 and again in 2028, and TSMC says AI demand still exceeds what it can make. Rated at about 26 GW, 2027’s chips need about 52 GW to run; allowing a quarter to install them, about 47 GW could be switched on during 2027. After 2027 we let accelerator spending rise from about $1T to $1.25T a year and each generation’s gains do the rest: 170M H100-equivalents in 2028 and 350M in 2030.
Power doesn’t keep up. About 24 GW came online for AI in 2026, by our estimate from chip deliveries; we assume power for about 27 GW was ready. For 2027 Morgan Stanley expects hyperscalers and neoclouds, 60–95% of new capacity, to add 32 GW. Goldman counts 2.7 times as much US capacity scheduled for 2027 as for 2026 but expects only half to 60% of it on time. Neither says whether it counts IT power or the whole facility. Trackers found most US projects due in 2027 not yet under construction in April, new gas turbines are being booked for delivery as late as 2031 and large transformers take more than three years. We expect about 38 GW of all-in capacity to come online in 2027, rising to 58 GW by 2030. That is within the range those forecasts imply once they are put on an all-in, worldwide basis, and above the top of our own power research’s range through 2029. Its central estimate, which applies project trackers’ delay rates, is about 23 GW in 2027 rising to 35 GW in 2030, with a high case rising from 30 GW in 2027 to 60 GW in 2030. It starts from a lower 2026, about 16 GW, partly because it takes Epoch’s end-2025 installed base at 2.5× chip power where we use 2×. Our path leaves chips for about 9 GW more than can be switched on in 2027; a consensus estimate cited by Elon Musk in August put that at about 15 GW.
Money binds first. AI capex is about $1T in 2026 (Goldman’s estimate). On street estimates for the hyperscalers, Oracle, SpaceX and the neoclouds, plus China and other buyers, it reaches about $1.4T in 2027 and $2.05T by 2030, growing 11–18% a year after 2027. All-in, a gigawatt of IT power costs about $45B to build today (Epoch puts a GB200 site at $38B, NVIDIA says $50–60B), rising to about $52B by 2030 as chips carry more value per watt. That pays for about 38 GW in 2027 and 51 GW in 2030, at or below our power path, so money is the limit in the base case from 2027. Both sit well below what the chipmakers could ship. The money includes the chips, so when it binds, fewer chips get bought than could be made, or chips wait for power. If these estimates are right, from 2027 new AI capacity is limited less by the fabs than by power and the money to build.
A gigawatt switched on in 2030 could do 19× the inference work of today’s average
Work per GW of the capacity switched on each year, as a multiple of the fleet operating today. Inference: tokens per MW on SemiAnalysis’s AgentX benchmark (DeepSeek V4 Pro, 100 tokens/s per user) for each year’s mix of hardware, our estimate from measured results and roadmaps. Training: peak 8-bit FLOP/s per GW, from the chips’ rated power per H100-equivalent. Capacity switched on in a year mixes the previous year’s fourth-quarter deliveries with its own first three quarters; 2026 is the fourth quarter’s.
Data
| × today’s average fleet, per GW switched on | 2026 | 2027 | 2028 | 2029 | 2030 |
|---|---|---|---|---|---|
| Inference, low | 1.7 | 3.2 | 5.1 | 7.5 | 10.7 |
| Inference, base | 2.4 | 4.6 | 7.5 | 12.2 | 19.0 |
| Inference, high | 3.1 | 6.6 | 12.0 | 21.0 | 35.2 |
| Training, low | 1.3 | 1.7 | 2.2 | 2.6 | 3.1 |
| Training, base | 1.5 | 2.2 | 2.9 | 3.8 | 5.0 |
| Training, high | 1.6 | 2.7 | 3.8 | 5.8 | 8.3 |
| Delivered that year, base | H2 2026 | 2027 | 2028 | 2029 | 2030 |
|---|---|---|---|---|---|
| Inference, × GB300 NVL72 | 0.8 | 1.7 | 2.7 | 4.5 | 6.9 |
| Inference, × today’s average | 2.4 | 5.2 | 8.3 | 13.8 | 21.1 |
| Training, × today’s average | 1.5 | 2.4 | 3.1 | 4.1 | 5.3 |
| M H100-equivalents per GW | 1.19 | 1.92 | 2.50 | 3.29 | 4.27 |
Today’s fleet averages 0.33× a GB300 NVL72 rack per MW on AgentX and 0.80M H100-equivalents per GW. The mix of deliveries by year is our estimate: in 2027 about half Vera Rubin, with TPUs, Trainium, AMD MI455X and custom chips; Rubin Ultra and Feynman from 2028. About 23% of what is switched on in 2027 was delivered in late 2026, and about 28% of 2030’s in late 2029.
Why gigawatt totals mislead
Today’s fleet is still about a fifth Hopper. On agentic inference a GB300 rack does about 12.6× an H200’s work per MW, and Vera Rubin about 2.1× a GB300’s (SemiAnalysis, measured on pre-release software). So the capacity switched on in 2027 does about 4.6× today’s average per gigawatt at inference, and 2030’s about 19× if Rubin Ultra and Feynman deliver what their roadmaps suggest. Training gains ride on FLOPs per watt, which improve about 30% a year: 2.2× today’s average for 2027’s capacity and 5.0× for 2030’s. These are peak 8-bit FLOPs, the way Epoch counts them. The training throughput our efficiency research expects newer chips to achieve is lower for capacity switched on through 2029; counted that way, 2027 would end 11% short and 2030 25% short. That research labels its tables by install year. We read them as each year’s deliveries, because its 2026 mix includes Rubin, which only ships from the fourth quarter; read as install years, 2027 would end 3% long and 2030 17% short.
Cheaper inference also raises demand. Capacity switched on in 2028 does about 58% more inference work per dollar than 2027’s, and about 60% and 52% more again in 2029 and 2030. If prices follow costs, each dollar customers spend buys that much more, so after 2027 inference demand rises with hardware gains just as supply does. Faster hardware therefore moves the balance mainly through training, which we count in FLOPs, and through the years to 2027, when demand follows usage.
Who gets the new hardware matters too. We split each year’s hardware between inference and training in the same proportion. Newer hardware’s edge is larger at inference (4.6× today’s average in 2027, against 2.2× at training). If it went to inference first and older chips did the training, the market would serve about 6–7 points more of demand each year. If the newest went to training first, as frontier labs train on their newest clusters, it would serve about 8–12 points less.
After 2027 demand grows faster than supply
Growth during each year in the base case, in compute terms. Supply: the compute installed, measured at that year’s mix of inference and training demand. Demand: inference plus training and research.
Data
| End of year | 2026 | 2027 | 2028 | 2029 | 2030 |
|---|---|---|---|---|---|
| Inference demand, low, × October 1 | 1.5× | 2.4× | 4.6× | 8.1× | 12× |
| Inference demand, base, × October 1 | 1.6× | 4.3× | 12× | 28× | 57× |
| Inference demand, high, × October 1 | 1.6× | 7.5× | 28× | 88× | 229× |
| Training and research, low, × October 1 | 1.2× | 2.1× | 2.9× | 3.8× | 4.5× |
| Training and research, base, × October 1 | 1.3× | 3.1× | 6.5× | 12× | 19× |
| Training and research, high, × October 1 | 1.3× | 4.3× | 12× | 30× | 66× |
| Supply, base, × today’s fleet | 1.4× | 4.3× | 9.2× | 18× | 32× |
| Demand, base, × today’s fleet, with today’s shortage | 1.7× | 4.3× | 10× | 22× | 41× |
| Growth during the year | Q4 2026 | 2027 | 2028 | 2029 | 2030 |
|---|---|---|---|---|---|
| Inference, low | 1.5× | 1.6× | 1.9× | 1.8× | 1.5× |
| Inference, base | 1.6× | 2.8× | 2.7× | 2.4× | 2.1× |
| Inference, high | 1.6× | 4.7× | 3.7× | 3.2× | 2.6× |
| Training and research, low | 1.2× | 1.7× | 1.4× | 1.3× | 1.2× |
| Training and research, base | 1.3× | 2.4× | 2.1× | 1.8× | 1.6× |
| Training and research, high | 1.3× | 3.2× | 2.8× | 2.5× | 2.2× |
Demand to 2030
Inference to 2027 is pack 009’s: OpenRouter’s compute on pack 007’s three paths. To scale it to the whole market we compared OpenRouter’s growth with six disclosed token counts over the same windows. The market grew at 0.32–0.86 of OpenRouter’s pace, measured in doublings, with a median of 0.63; we use 0.6. We apply it to OpenRouter’s compute rather than its tokens, because OpenRouter’s mix is probably moving to small, cheap models faster than the market’s; applied to tokens, demand at the end of 2027 would be about 28% lower. That puts the market’s inference demand at 4.3× today’s by the end of 2027, about 2.8× during 2027 alone. Pack 009’s headline, about 47 GW of new GB300 racks by December 2027, assumed the whole market grew at OpenRouter’s full pace. At 0.6 of it, measured as pack 009 does from October’s average to December’s, inference needs about 15 GW of GB300s, or about 10 GW of the capacity switched on in 2027, before counting today’s shortage.
After 2027, spending decides. Pack 007’s paths have OpenRouter’s growth halving every three, six or twelve months. Carried past 2027, the base path has OpenRouter’s compute growing 65% in 2028, 14% in 2029 and 3% in 2030, which describes one marketplace maturing rather than the market. Instead we let inference demand follow what customers spend on it: 1.7× in 2028, 1.5× in 2029 and 1.35× in 2030 in the base case. That is slower than the leading labs plan to grow. OpenAI’s plan takes revenue from $36B in 2026 to $350B in 2030, about 1.8× a year, and Anthropic’s internal forecast of $190–200B in 2028 implies about 1.9× a year from an estimated $55B in 2026. Each dollar buys as much more inference as the capacity switched on that year delivers per dollar, 1.5–1.6× more each year. So inference demand grows about 2.7× in 2028, 2.4× in 2029 and 2.1× in 2030, reaching 57× today’s level by 2030.
Training and research use about 60% of today’s chips, and pack 009 didn’t project them. We let them grow 2.4× in 2027, slowing to 1.6× in 2030, measured in 8-bit FLOPs: 19× today’s by 2030. The anchors: OpenAI’s compute roughly quadrupled in each of 2024 and 2025 (Epoch AI); it ended 2025 with 1.9 GW and targets 30 GW by 2030. Anthropic, at about 2 GW early in 2026, has placed about 5 GW of demand with Broadcom for 2027 and 10 GW for 2028 and could pass 30 GW by 2030 (22V Research). The power behind frontier training runs grows 2.2–2.9× a year (Epoch AI). We assume market-wide training grows more slowly than these labs’ plans: they use less than half of the world’s AI compute.
The market grows at about 0.6 of OpenRouter’s pace
Growth of each disclosed token count, in doublings, divided by OpenRouter’s over the same window (its average for the 30 days before each date). 1 would be OpenRouter’s pace. Disclosures use different definitions, so they compare within a series, not with each other. Two rows are Google’s all-products total over overlapping windows; dropping either moves the median to 0.57 or 0.69.
Data
| Series | Window | Growth | A year | OpenRouter, a year | Pace |
|---|---|---|---|---|---|
| Google, all products | May 2025 – May 2026 | 6.7× | 6.7× | 13× | 0.75 |
| Google, all products, since October | Oct 2025 – May 2026 | 2.5× | 4.4× | 13× | 0.57 |
| Google, model APIs | Oct 2025 – Jul 2026 | 3.1× | 4.8× | 25× | 0.49 |
| OpenAI, API | Oct 2025 – Mar 2026 | 2.5× | 6.7× | 16× | 0.69 |
| ByteDance, Doubao | Sep 2025 – Jun 2026 | 6.0× | 12× | 18× | 0.86 |
| China, national | Dec 2025 – Mar 2026 | 1.4× | 4.4× | 106× | 0.32 |
What tips the balance
Supply against demand at the end of the year with one input at its low or high setting and everything else at the base case (demand 20% above supply today). The dot is the base case.
Data
| One input changed | Q4 2026 | 2027 | 2028 | 2029 | 2030 |
|---|---|---|---|---|---|
| Base case | −19% | −1% | −9% | −18% | −21% |
| No shortage today | −3% | +19% | +9% | −1% | −6% |
| Shortage today 30% | −25% | −8% | −16% | −24% | −27% |
| Hardware gains at the low end | −24% | −19% | −30% | −38% | −43% |
| Hardware gains at the high end | −15% | +20% | +14% | +11% | +11% |
| Inference 30% of today’s chips | −18% | −3% | −11% | −18% | −21% |
| Inference 50% of today’s chips | −19% | +1% | −8% | −17% | −22% |
| Market at 0.45 of OpenRouter’s pace | −15% | +11% | +2% | −7% | −10% |
| Market at 0.75 of OpenRouter’s pace | −23% | −14% | −22% | −30% | −33% |
| Inference follows pack 007’s base path to 2030 | −19% | −1% | +10% | +17% | +22% |
| Training at the low end | −17% | +26% | +40% | +41% | +43% |
| Training at the high end | −21% | −21% | −41% | −58% | −69% |
| Inference spending after 2027 at the low end | −19% | −1% | +1% | +1% | +5% |
| Inference spending after 2027 at the high end | −19% | −1% | −20% | −38% | −49% |
| Supply at the low end | −24% | −20% | −30% | −38% | −43% |
| Supply at the high end | −14% | +22% | +26% | +27% | +25% |
| Power at our power research’s high case | −19% | −15% | −18% | −22% | −24% |
| Power at our power research’s central estimate | −19% | −27% | −37% | −44% | −47% |
| Chips only: power and money keep up | −19% | +15% | +20% | +18% | +17% |
| New hardware to inference first | −13% | +6% | −4% | −11% | −14% |
| New hardware to training first | −23% | −12% | −18% | −26% | −30% |
| Training gains as achieved, not peak | −22% | −11% | −19% | −24% | −25% |
| Inference gains read as install-year, no lag | −19% | +3% | −5% | −14% | −17% |
| Software gains outrun heavier models by 8% a year | −18% | +3% | −6% | −15% | −18% |
What would change the numbers
Training and research budgets. The biggest lever. If they grow only 4.5× by 2030, supply ends 2030 43% ahead of demand, a glut. If they grow 66×, the market is 69% short. Much of this is spent by a few labs that are still raising the money.
Power and money. If capacity added stays near 30 GW a year, 2030 is 43% short. At our power research’s central estimate it is 47% short, and at its high case 24% short. If power follows SemiAnalysis’s path, about 90 GW a year by 2029, with capex to match, supply runs 25% ahead by 2030. Chips aren’t what holds supply back in our base case: if power and money kept up with every chip the industry could deliver, supply would run 17% ahead by 2030.
Inference spending. If what customers spend on inference grows only 1.2×, 1.1× and 1.0× in 2028–30, the market stays near balance (+5% in 2030). If it grows 2.35×, 2.0× and 1.7×, faster than even OpenAI’s plan, 2030 is 49% short.
Hardware. If Rubin Ultra slips (SemiAnalysis reported in July that its 144-GPU rack moves to 2028), Feynman disappoints and the 2026–27 mix underdelivers too, 2030 is 43% short. If they beat their roadmaps, it is 11% long. Because cheaper inference also raises demand, hardware moves the balance mostly through training and the years to 2027. Software gains on existing chips help a little: the efficiency research’s central case, software gains of 30% a year against workloads 20% heavier, would leave 2030 18% short instead of 21%.
Who gets the new hardware. If the newest hardware went to inference first, where its edge is largest, 2030 would be 14% short; if it went to training first, 30% short.
Today’s shortage. With no shortage today, supply leads by 19% at the end of 2027 and 2030 ends 6% short. If demand runs 30% above supply today, 2027 ends 8% short.
Inference to 2027. The pace against OpenRouter and inference’s share of today’s chips move 2027 between 12 points up and 13 points down. Letting OpenRouter’s growth fade, as pack 007’s base path does if carried to 2030, would leave 22% more compute than demand by 2030.
What to watch
Gigawatts switched on in 2027. Our base case has about 38 GW. Hyperscalers report capacity added each quarter, and turbine and transformer deliveries lead them. At our power research’s high case, 30 GW, the market ends 2027 15% short.
Capex plans for 2028–30. Street estimates have AI capex growing about 18% in 2028 and 11% by 2030. If lab revenue grows as planned, that is too little; capex rising faster than that is how the gap would close.
Lab revenue against plan. OpenAI’s and Anthropic’s revenue, funding rounds and IPOs decide both what customers spend on inference and what labs spend on training, the two largest demand inputs after 2027.
Rubin in the field. SemiAnalysis measured Rubin at about 2× GB300 per MW on pre-release software. Production results, and when Rubin Ultra ships, set how much each 2027–28 gigawatt is worth.
Rents. In September the B200 rental curve priced the 12-month forward about 12% below spot: the market expects some easing within a year, consistent with supply catching up during 2027.
What this is anchored on
Supply, power, capex and demand paths, efficiency by year, the shortage today and the balance are our estimates, built from the sources below. OpenRouter data is licensed under CC BY 4.0.
| Item | Data point | Source |
|---|---|---|
| Today’s fleet and demand | AI chips operating, their power, the inference share, AgentX throughput by system and OpenRouter’s compute paths to December 2027 | 06.ai pack 009 |
| OpenRouter paths | Tokens and spend to December 2027, with growth halving every 3, 6 or 12 months | 06.ai pack 007 |
| OpenRouter tokens | Daily tokens by model, January 2025 to October 2026, for the pace comparison | OpenRouter rankings dataset (CC BY 4.0) |
| Chips delivered | 20.3M H100-equivalents delivered by end-2025; 4.98M and 6.33M in the first two quarters of 2026, rated at 2.7 and 3.2 GW | Epoch AI chip-sales data (via pack 009) |
| Chips by designer | Q2 2026 share of compute sold: NVIDIA 63%, Google 25%, Amazon 5%, AMD 4%, Huawei 3% | Epoch AI, updated Oct 19 |
| Chip ratings | Vera Rubin 8.84 H100-equivalents per chip; TPU v8i 5.1; B300 2.53 | Epoch AI chip-types data, Oct 14 |
| Facility power | A data center draws about twice its AI chips’ rated power | Epoch AI chip-sales data |
| NVIDIA | A supply-constrained outlook of about 70% revenue growth in the year to January 2028; supply the bottleneck at least through then | CFO Dive, Aug 27 |
| NVIDIA | At least $1T of Blackwell and Rubin demand and orders through 2027 | DCD, GTC, Mar 16 |
| NVIDIA | A GW costs about $50–60B; NVIDIA’s content per GW about $18B for Hopper, $25B for Blackwell, $40B for Vera Rubin; supply supports about 70% revenue growth in fiscal 2028, against demand growth nearer 100%; top-5 hyperscaler capex near $800B in 2026 and $1.3T in 2027 | NVIDIA Q2 FY27 call, Aug 26 |
| Broadcom | AI revenue outlook about $115B in fiscal 2027 and $230B in fiscal 2028 | Bloomberg, via The Star, Sep 4 |
| TSMC | AI demand still exceeds what TSMC can supply | TSMC Q3 call, via AP, Oct 15 |
| Packaging | TSMC CoWoS capacity about 130K wafers a month at end-2026, doubling by 2028 | TrendForce, Sep 14 |
| Memory | HBM bit shipments up 50–60% in 2027, still short of demand | TrendForce, Aug 4 |
| Google TPUs | TPU shipments estimated at 4.5M in 2026 and 8.8M in 2027 | GF Securities, via 24/7 Wall St, Aug 25 |
| AMD | Helios racks shipping from late Q3 2026; 6 GW for OpenAI, 6 GW for Meta and up to 2 GW for Anthropic | Converge Digest, Jul 24 |
| Power | Hyperscalers and neoclouds add 32 GW in 2027 and 39 GW in 2028, 60–95% of new capacity worldwide | Morgan Stanley, via Zhitong, Oct 5 |
| Power | US data-center capacity scheduled for 2026 13.6 GW and 2027 36.3 GW; only 50–60% assumed on time | Goldman Sachs, via OilPrice, Aug 22 |
| Power | About 30 GW of AI compute added in 2026, 50 GW in 2027, 70 GW in 2028 and 90–100 GW in 2029 | Dylan Patel (SemiAnalysis), via The Neuron, Aug 31 |
| Power | A consensus estimate that about 15 GW of AI compute made in 2027 can’t be switched on in 2027 | Elon Musk, via 24/7 Wall St, Aug 29 |
| Power | At least 16 GW of large projects slated for 2026 worldwide, about 5 GW under construction in February; 30–50% unlikely to finish on time | Sightline Climate, via Latitude Media, Feb 24 |
| Power | More than 60% of US projects due in 2027 not under construction in April | SynMax, via the FT (Longbridge), Apr 17 |
| Equipment | A heavy-duty GE Vernova gas turbine ordered now arrives in 2031; Mitsubishi Heavy’s new orders deliver in 2028–30 | OilPrice, Aug 22 |
| Equipment | Generator step-up transformers take more than 160 weeks; one utility is buying about five years ahead | Wood Mackenzie, via Reuters, Jul 9 |
| Capex | Global AI investment about $1T in 2026 | Goldman Sachs, Aug 7 |
| Capex | Alphabet, Microsoft, Amazon, Meta, Oracle and SpaceX: about $800B in 2026, $1.2T in 2027 and $1.4T in 2028 | Goldman Sachs, via Crypto Briefing, Sep 25 |
| Capex | Hyperscaler, Oracle, SpaceX and neocloud capex to 2030 | 06.ai packs 001–003 |
| Cost per GW | $38B per GW of IT power for a GB200 NVL72 site | Epoch AI, May 14 |
| Cost per GW | $34.6–39.5B per GW by architecture, from OpenAI’s custom chip to Vera Rubin | Bernstein, via Phemex, Oct 10 |
| Inference per MW | Vera Rubin NVL72 59.4M tokens/s per MW on AgentX at 100 tokens/s per user, 2.09× GB300 NVL72 (pre-release software) | SemiAnalysis InferenceX, Sep 14 |
| Inference per MW | Vera Rubin about 2× GB300 per MW up to 100 tokens/s per user on DeepSeek-R1 | SemiAnalysis, Jul 23 |
| Rubin | 35 PF dense NVFP4 and 17.5 PF dense FP8 per GPU | NVIDIA Vera Rubin NVL72 page |
| Rubin Ultra | Kyber NVL144 rack reported slipping more than a year, to 2028 | SemiAnalysis, via MLQ, Jul 6 |
| Hardware trends | Chip performance per dollar up about 49% a year since 2023 | Epoch AI, Aug 13 |
| Hardware trends | Peak FLOP/s per watt of ML GPUs up about 1.28× a year | Epoch AI, Aug 2024 |
| Tokens | Google: 480T tokens a month in May 2025, more than 3.2 quadrillion in May 2026 | Google I/O, May 19 |
| Tokens | Google: about 1.3 quadrillion tokens a month in October 2025 | Google, via Robonomics |
| Tokens | Google’s models: 7B tokens a minute via direct API use in October 2025 | Alphabet Q3 2025 call, Oct 29, 2025 |
| Tokens | Google’s model APIs: about 22B tokens a minute in July 2026 | Alphabet Q2 call, via MarketBeat, Jul 22 |
| Tokens | OpenAI’s API: 6B tokens a minute in October 2025 | TechCrunch, Oct 6, 2025 |
| Tokens | OpenAI’s APIs: more than 15B tokens a minute as of March 31 | Quartz, via Yahoo Finance, Mar 31 |
| Tokens | Doubao: more than 30T tokens a day in September 2025 | Volcano Engine, via KrASIA, Oct 21, 2025 |
| Tokens | Doubao: more than 180T tokens a day in June 2026 | Volcano Engine, via Diario Bitcoin, Jun 23 |
| Tokens | China: about 100T tokens a day at end-2025, more than 140T in March 2026 | National Data Administration, via China Daily, Mar 25 |
| Lab revenue | OpenAI plans revenue of $36B in 2026 rising to $350B in 2030, and about $856B on compute and infrastructure | FT, via Reuters, Sep 18 |
| Lab revenue | Anthropic’s internal forecast of about $190–200B of revenue in 2028 | Reuters, via The Next Web, Aug 17 |
| Lab compute | OpenAI ended 2025 with about 1.9 GW of compute, more than triple a year earlier | DCD, Jan 21 |
| Lab compute | OpenAI targets 30 GW by 2030 | YourStory, Apr 23 |
| Lab compute | Anthropic at about 2 GW early in 2026; about 5 GW of demand placed with Broadcom for 2027 and 10 GW for 2028; over 30 GW by 2030 | 22V Research, Sep 4 |
| Lab compute | OpenAI’s compute about 0.39M H100-equivalents in 2024 and 1.74M in 2025 | Epoch AI, Sep 9 |
| Training | The power drawn by frontier training runs grows 2.2–2.9× a year; the largest could draw 4–16 GW by 2030 | Epoch AI and EPRI, Aug 2025 |
| Shortage | H100 one-year rental contracts from about $1.70 an hour in October 2025 to $2.35 in March 2026 | SemiAnalysis, Apr 2 |
| Shortage | B200 rental index up about 28% this year to September 1; 12-month forward about 12% below spot in September | Silicon Data |
| Shortage | Not enough capacity to meet demand in 2026, likely the same in 2027 | Amazon Q2 call, via The Motley Fool, Jul 30 |
| Shortage | Supply and demand rebalance in the second half of 2027 at the earliest, the first half of 2028 more likely | Goldman Sachs, via KuCoin, Sep 15 |
Method
Units and clock. Supply and demand are both counted in gigawatts of today’s hardware: the work one gigawatt of the fleet operating in September 2026 does, for inference (AgentX tokens, pack 009’s measure) or for training (peak 8-bit FLOP/s, Epoch AI’s H100-equivalents). Today’s fleet is 31.6M H100-equivalents, about 40 GW all-in, 40% of it serving inference. A gigawatt installed later counts for its multiple of today’s average. Today is October 1, 2026: the fleet is the chips delivered to June 2026, demand is measured from October 1 (OpenRouter’s October figure covers October 1–18), and every balance is at December 31. The balance is the largest share of both demands the installed capacity can serve at once, with every year’s hardware split between inference and training in the same proportion. All power figures are all-in, at the facility, about 1.3× IT power; several forecasts we cite don’t say which they count.
Chips. Our estimate of what the designers Epoch tracks could deliver: 33, 100, 170, 250, 350M H100-equivalents in 2026–30 (range 185–550M in 2030), rated at 15, 26, 34, 38, 41 GW. 2026 builds on Epoch’s first half and NVIDIA’s guided second half; 2027 on NVIDIA’s guidance, Broadcom’s outlook, TPU and AMD unit estimates and CoWoS and HBM capacity; 2028–30 on accelerator spending of $1T, $1.15T, $1.25T and about 30% more H100-equivalents per dollar each year. Chips switch on a quarter after delivery, at twice their rated power: 30% of a year’s deliveries come in its fourth quarter and switch on the next year. We split 2026’s second half between the third and fourth quarters 9:13, as for its H100-equivalents; the fourth quarter’s heavier Rubin mix would put a little more power in the third.
Power and money. Power: 38, 46, 52, 58 GW in 2027–30, our estimate from analysts’ forecasts put on an all-in, worldwide basis (Morgan Stanley, Goldman). Our power research’s own synthesis is lower: 23, 28, 31, 35 GW, high case 30, 40, 50, 60 (sensitivities). Low 30, 33, 35, 37; high 50, 70, 95, 105 (SemiAnalysis to 2029; 2030 ours). Money: AI capex of $1T, $1.4T, $1.65T, $1.85T, $2.05T in 2026–30, from the street capex in packs 001–003 plus China’s largest platforms, sovereigns and others (86–88% AI), divided by $45, 48, 50, 51, 52B per GW of IT power and multiplied by 1.3 for facility power. The money includes the chips. What comes online each year is the lowest of chips, power and money; chips beyond that aren’t counted.
Each year’s hardware. Inference: AgentX tokens per MW for each year’s deliveries, 0.8, 1.7, 2.7, 4.5, 6.9× a GB300 NVL72 rack in 2026–30, our estimate anchored on SemiAnalysis’s measurements (Vera Rubin 2.09×) and roadmaps; low 0.55, 1.2, 1.8, 2.7, 3.8; high 1, 2.5, 4.4, 7.8, 13. Divided by today’s fleet average, 0.33× GB300. Training: H100-equivalents per GW from the chips’ rated power, against today’s 625 W per H100-equivalent; low and high from our range for training gains per MW. Capacity switched on in a year blends the previous year’s fourth-quarter deliveries with its own first three quarters, by power. Our efficiency research labels its tables by install year; we read them as deliveries (a sensitivity). Software stays at today’s level: we assume its gains offset heavier models and longer contexts (the efficiency research’s central case nets about 8% a year; a sensitivity).
Demand. Inference to December 2027: pack 009’s OpenRouter compute paths raised to the power 0.6, the market’s pace (calibrated above; 0.45–0.75 as a sensitivity), read at December 31. After 2027: what customers spend on inference grows 1.7, 1.5, 1.35× a year in the base case (1.2, 1.1, 1 low; 2.35, 2, 1.7 high), times the gain in inference work per dollar of the capacity switched on that year (1.58, 1.60, 1.52× in the base case, from the same hardware and supply cases). Training and research: 2.7, 2.4, 2.1, 1.8, 1.6× a year in 2026–30 (2.2, 1.7, 1.4, 1.3, 1.2 low; 3.2, 3.2, 2.8, 2.5, 2.2 high), the first applied to October–December only. Today’s shortage, demand 20% above supply (0–30%), scales demand in every year.
Needed GW is the capacity of that year’s hardware that, added to everything installed before, makes supply equal demand at year-end. Utilization stays at 60% throughout, as in pack 009; the table gives the utilization at which supply would just meet demand. We keep today’s chips in service and don’t model refreshes: replacing Hopper inside existing buildings would add supply without new power, though not without money. Disclosed token counts use different definitions; each is compared only with itself over time.