Analysis · AI infrastructure

024When does replacing old GPUs beat building new power?

A megawatt of H100s still earns 2.6–6.5 times what a new powered megawatt costs, so where power can be had, building it beats ripping Hopper out. Where it can’t arrive in time, the megawatt is worth what the newest chips would earn in it: on that test, swapping H100s for B300s has paid since mid-March at on-demand prices, though not at three-year prices. If compute stops being scarce, Hopper lasts until renters pay about 3.4 times as much per kilowatt for the newest chips; today they pay 1.7–2.1 times. Replacement becomes half of new GPU deployments once powered capacity grows less than about 15–26% a year.

A megawatt of H100s earns
6.5×
the cost of a new powered megawatt, at on-demand prices. 2.6× at implied three-year prices
H100 against the power-wall line
0.80×
$3.90 an hour on demand against a $4.85 line set by the B300. Below it every week since Mar 16
Where Hopper loses even with power to spare
3.4×
the B300’s rent per kW over the H100’s. Today 1.7–2.1×
Replacement share of new GPU megawatts
15–32%
at about 46% a year growth in US data-center power. Half once growth slows to 15–26%

The rule

An old fleet should keep its megawatt while its cash margin there beats what that megawatt is worth to the next use. If new power can arrive in time, that is the cost of a new powered megawatt. If it can’t, it is what the newest chips would clear in this one after paying for themselves. Size enters only through which of the two applies: a bigger build-out makes the next megawatt slower to get, which moves more sites from the first case to the second.

Divided by the kilowatt-hours a megawatt delivers in a year, each case becomes a price per kWh of IT capacity, and any GPU’s rent can be set against it. A GPU’s rent per kWh is its hourly rent over its power, counting its share of the server and network. There are three lines:

  • Power available, $0.56 per kWh: a new powered megawatt plus power and upkeep. Below it, a GPU isn’t worth its slot anywhere.
  • Power wall: the newest GPU’s rent per kWh less its capital charge, $1.33 for a B300. Below it, a site that can’t get new power in time earns more by swapping in the newest chips.
  • New chips idle: the newest GPU’s whole rent per kWh. Below it, frontier chips already bought and waiting for power should take the slot.

What a megawatt earns

A megawatt of H100s clears $7.9M–$19.5M a year after power and upkeep; a new powered megawatt costs about $3.0M a year. At every point on the price curve, Hopper out-earns its slot.

What a megawatt of H100s earns a year

H100 rents from 06.ai’s GPU Compute Price Index at the Nov 5, 2026 fixing: the trimmed mean across providers on demand, and term prices implied from providers’ own term-to-on-demand ratios. A megawatt holds about 714 H100s at 1.4 kW each, server and network included, rented 85% of the hours.

H100 price$ per GPU-hourRevenue a yearAfter power and upkeep× a new powered megawatt
On-demand composite$3.90$20.7M$19.5M6.5×
One-year, implied$2.69$14.3M$13.1M4.4×
Three-year, implied$1.70$9.1M$7.9M2.6×

The new megawatt is mostly building, not power. Epoch AI puts a 1 GW AI site at $38B upfront and $8.5B a year all-in, with servers about $5B and operations $0.9B of that. The rest annualizes to about $2.6M per MW, between hyperscale leases and wholesale colocation at $100–250 per kW-month.

Generation is the small part. BNEF put new combined-cycle gas plants at $2,157/kW in 2025, and GE Vernova’s CEO expects 2026 gas-turbine orders to price about 50% higher per kW than 2025’s. Even at $5,000/kW, more than twice the BNEF figure, on-site generation adds only about $0.6M per MW-year over 20 years.

Spread over the kilowatt-hours a megawatt delivers, the slot and upkeep ($3.0M + $1.2M) come to $0.56 per kWh of IT capacity. An H100 or H200 keeps its slot above $0.79 an hour, an A100 above $0.51, a B200 above $1.07. Every GPU in the index clears that by 1.8× or more, on every price basis.

Rent per kWh against the three lines

Each GPU’s rent per GPU-hour over its power in kW, server and network share included, at the Nov 5, 2026 fixing. The GB200 is left out: too few providers quote it. Term prices are implied from providers’ term-to-on-demand ratios; the B300’s rest on one or two providers.

On on-demand prices, 4 of 7 GPUs rent below the power-wall line the B300 sets, the H100 at 0.80× of it. Every one clears the power-available line, the lowest (L40S) by 4.0×.

Below the power-wall lineAbove itB300, the newest, which sets the lines
Power available $0.56Power wall $3.46New chips idle $4.80B300B300, on-demand: $9.59 an hour at 2.0 kW is $4.80 per kWh. The newest GPU here, it sets the power-wall and new-chips-idle lines.$4.80B200B200, on-demand: $7.74 an hour at 1.9 kW is $4.08 per kWh, 7.22× the power-available line, 1.18× the power-wall line and 0.85× the new-chips-idle line$4.08H200H200, on-demand: $5.47 an hour at 1.4 kW is $3.90 per kWh, 6.92× the power-available line, 1.13× the power-wall line and 0.81× the new-chips-idle line$3.90MI300XMI300X, on-demand: $4.39 an hour at 1.2 kW is $3.66 per kWh, 6.49× the power-available line, 1.06× the power-wall line and 0.76× the new-chips-idle line$3.66H100H100, on-demand: $3.90 an hour at 1.4 kW is $2.78 per kWh, 4.93× the power-available line, 0.80× the power-wall line and 0.58× the new-chips-idle line$2.78RTX PRO 6000RTX PRO 6000, on-demand: $2.21 an hour at 0.85 kW is $2.60 per kWh, 4.60× the power-available line, 0.75× the power-wall line and 0.54× the new-chips-idle line$2.60A100A100, on-demand: $2.22 an hour at 0.9 kW is $2.46 per kWh, 4.37× the power-available line, 0.71× the power-wall line and 0.51× the new-chips-idle line$2.46L40SL40S, on-demand: $1.35 an hour at 0.6 kW is $2.26 per kWh, 4.00× the power-available line, 0.65× the power-wall line and 0.47× the new-chips-idle line$2.26
Available $0.56Power wall $3.46Chips idle $4.80B300B300, on-demand: $9.59 an hour at 2.0 kW is $4.80 per kWh. The newest GPU here, it sets the power-wall and new-chips-idle lines.$4.80B200B200, on-demand: $7.74 an hour at 1.9 kW is $4.08 per kWh, 7.22× the power-available line, 1.18× the power-wall line and 0.85× the new-chips-idle line$4.08H200H200, on-demand: $5.47 an hour at 1.4 kW is $3.90 per kWh, 6.92× the power-available line, 1.13× the power-wall line and 0.81× the new-chips-idle line$3.90MI300XMI300X, on-demand: $4.39 an hour at 1.2 kW is $3.66 per kWh, 6.49× the power-available line, 1.06× the power-wall line and 0.76× the new-chips-idle line$3.66H100H100, on-demand: $3.90 an hour at 1.4 kW is $2.78 per kWh, 4.93× the power-available line, 0.80× the power-wall line and 0.58× the new-chips-idle line$2.78RTX PRO 6000RTX PRO 6000, on-demand: $2.21 an hour at 0.85 kW is $2.60 per kWh, 4.60× the power-available line, 0.75× the power-wall line and 0.54× the new-chips-idle line$2.60A100A100, on-demand: $2.22 an hour at 0.9 kW is $2.46 per kWh, 4.37× the power-available line, 0.71× the power-wall line and 0.51× the new-chips-idle line$2.46L40SL40S, on-demand: $1.35 an hour at 0.6 kW is $2.26 per kWh, 4.00× the power-available line, 0.65× the power-wall line and 0.47× the new-chips-idle line$2.26
Data
On-demandRent an hourProviderskWPer kWh× power available× power wall× chips idleB300 ÷ GPU, per kW
GB200$16.0032.0$8.0014.18×2.31×1.67×0.60×
B300$9.59102.0$4.808.50×———
B200$7.74161.9$4.087.22×1.18×0.85×1.18×
H200$5.47191.4$3.906.92×1.13×0.81×1.23×
MI300X$4.3951.2$3.666.49×1.06×0.76×1.31×
H100$3.90241.4$2.784.93×0.80×0.58×1.72×
RTX PRO 6000$2.21190.85$2.604.60×0.75×0.54×1.85×
A100$2.22200.9$2.464.37×0.71×0.51×1.95×
L40S$1.35150.6$2.264.00×0.65×0.47×2.13×

Lines per kWh on this basis: power available $0.56; power wall $3.46 on demand, the B300’s rent per kWh less its $1.33 capital charge; new chips idle, the B300’s rent per kWh. The GB200 (greyed) has one to three providers on each basis.

A hard power wall

When new power arrives after the old chips’ earning life ends, a megawatt is worth what the newest chips would earn in it, net of their own capital cost. By that measure, at on-demand prices, swapping H100s for B300s has paid since mid-March 2026.

The test, per kWh: swap when the newest chip’s rent beats the incumbent’s by more than the newest chip’s capital charge. For a B300 that charge is $1.33 per kWh: about $63,000 per GPU all-in over 2.0 kW, recovered over 4 years at 10%. The server price is American Compute’s $400,000–450,000 per new 8-GPU B300 machine at volume, plus about 20% for network, storage and installation.

On Nov 5 a B300 rented for $9.59 an hour on demand, or $4.80 per kWh. That puts the power-wall line at $3.46 per kWh: $4.85 an hour for an H100, which rented for $3.90, or 0.80× of its line. A100s sat lower still at 0.71×; MI300Xs (1.06×), H200s (1.13×) and B200s (1.18×) cleared it.

A year against the power-wall line

GetDeploying’s weekly median on-demand rent per kWh, against the power-wall line the B300 set that week: its own rent per kWh less today’s $1.33 capital charge. Shaded: weeks the GPU rented below the line. Only one to five providers listed the B300 before April 2026, so read the early weeks loosely.

The H100 has rented below its power-wall line every week since Mar 16, 2026, at 0.81× of it in the week of Nov 2.

GPU rent per kWhPower-wall lineBelow the line
$1.00$2.00$3.00$4.002026MarMayJulSepNovPower-wall line$3.42H100 rent$2.76
$1.00$2.00$3.00$4.00’26MarMayJulSepNovWall line$3.42H100 rent$2.76
Data
Week ofH100 an hourPer kWhB300 an hourB300 providersWall line per kWh× the line
Nov 2, 2026$3.87$2.76$9.5015$3.420.81×
Oct 26, 2026$3.83$2.74$9.1517$3.240.84×
Oct 19, 2026$3.71$2.65$8.9915$3.160.84×
Oct 12, 2026$3.50$2.50$8.9915$3.160.79×
Oct 5, 2026$3.49$2.49$8.9915$3.160.79×
Sep 28, 2026$3.38$2.42$8.6316$2.980.81×
Sep 21, 2026$3.38$2.41$7.8914$2.610.92×
Sep 14, 2026$3.34$2.39$7.8713$2.600.92×
Sep 7, 2026$3.34$2.39$7.8912$2.610.91×
Aug 31, 2026$3.32$2.37$7.8911$2.610.91×
Aug 24, 2026$3.37$2.41$7.8710$2.600.93×
Aug 17, 2026$3.38$2.42$7.8911$2.610.93×
Aug 10, 2026$3.37$2.41$7.9212$2.630.92×
Aug 3, 2026$3.38$2.41$7.999$2.660.91×
Jul 27, 2026$3.35$2.40$7.859$2.590.93×
Jul 20, 2026$3.20$2.28$7.857$2.590.88×
Jul 13, 2026$3.08$2.20$8.186$2.750.80×
Jul 6, 2026$3.32$2.37$8.238$2.780.85×
Jun 29, 2026$3.07$2.19$7.676$2.500.88×
Jun 22, 2026$3.00$2.14$7.999$2.660.80×
Jun 15, 2026$2.99$2.14$7.928$2.630.81×
Jun 8, 2026$3.00$2.14$8.168$2.750.78×
Jun 1, 2026$3.00$2.14$7.678$2.500.86×
May 25, 2026$2.97$2.12$8.426$2.870.74×
May 18, 2026$2.99$2.14$7.505$2.420.88×
May 11, 2026$2.99$2.14$7.256$2.290.93×
May 4, 2026$2.99$2.14$7.507$2.420.88×
Apr 27, 2026$2.95$2.11$7.257$2.290.92×
Apr 20, 2026$2.99$2.14$7.256$2.290.93×
Apr 13, 2026$2.99$2.14$7.256$2.290.93×
Apr 6, 2026$2.93$2.09$7.005$2.170.97×
Mar 30, 2026$2.92$2.09$7.005$2.170.96×
Mar 23, 2026$2.94$2.10$7.504$2.410.87×
Mar 16, 2026$2.92$2.09$7.134$2.230.94×
Mar 9, 2026$2.93$2.09$6.504$1.911.09×
Mar 2, 2026$2.96$2.12$5.743$1.541.38×
Feb 23, 2026$2.96$2.11$5.743$1.541.38×
Feb 16, 2026$2.99$2.14$6.134$1.731.24×
Feb 9, 2026$2.98$2.13$6.134$1.731.23×
Feb 2, 2026$2.99$2.14$5.564$1.451.48×
Jan 26, 2026$2.99$2.14$5.454$1.391.54×
Jan 19, 2026$2.99$2.14$5.454$1.391.54×
Jan 12, 2026$2.99$2.14$5.454$1.391.54×
Jan 5, 2026$2.99$2.14$5.454$1.391.54×
Dec 29, 2025$2.99$2.14$5.454$1.391.54×
Dec 22, 2025$2.99$2.14$5.454$1.391.54×
Dec 15, 2025$2.99$2.14$5.454$1.391.54×
Dec 8, 2025$2.99$2.14$5.003$1.171.83×
Dec 1, 2025$2.99$2.14$5.452$1.391.54×
Nov 24, 2025$2.99$2.14$5.452$1.391.54×
Nov 17, 2025$2.98$2.13$5.001$1.171.83×
Nov 10, 2025$2.99$2.14$5.001$1.171.83×

Data: GetDeploying, CC BY 4.0: the weekly median of each provider’s median price. Power per GPU as in the method.

The crossing came when B300 rents jumped in March. In GetDeploying’s weekly medians the B300 went from $5.74 to $7.13 an hour between Mar 2 and Mar 16, when only 4 providers listed it. H100s have rented below their line every week since.

The three-year curve disagrees. At implied three-year prices the B300’s premium over the H100 shrinks to $0.95 per kWh, below its capital charge, and the H100 clears its line by 1.46×. That curve rests on a single provider’s B300 term ratio, but it says the premium is priced to fade before a B300 pays for itself.

If the new chips are already bought and idle, there’s no capital charge left to clear. The line becomes the B300’s whole rent, $6.72 an hour for an H100. That was Microsoft’s position when Satya Nadella said on the BG2 podcast in October 2025 that it had chips in inventory and no powered shells to plug them into.

The wall is real for the next few years. GE Vernova’s gas-power backlog and slot reservations reached 122 GW at the end of the third quarter of 2026, and management says it has sold slots for 2032 delivery. American Compute’s conservative residual forecast puts used H100s at 11–19% of list in 2027 and 5–7% in 2028, so most of Hopper’s earning life ends before those turbines arrive. Evicted chips still have buyers: a used 8-GPU H100 node was worth about $195,000 in August.

If compute stops being scarce

Then Hopper survives as long as renters value its kilowatt at more than about 30% of the newest chip’s. Today they value it at about half.

In that world the newest chip rents at its full cost: its $1.33 capital charge plus the $0.56 slot and upkeep, or $1.90 per kWh. If renters keep paying the same ratio between generations, an old GPU rents at $1.90 divided by that ratio. It keeps its slot while that beats $0.56, so the break comes at a ratio of 3.4×.

Today’s prices are far from that equilibrium. A B300 rents for $4.80 per kWh on demand, 2.5× its full cost; even its implied three-year price ($2.17) sits 14% above. Per kilowatt, though, a B300 rents for only 1.7–2.1× an H100, depending on the price basis. If scarcity ended at those ratios, an H100 would rent for about $1.25–1.54 an hour, still well above its $0.79 line.

Vendor claims point the other way. In Nvidia’s own tests, GB300 NVL72 delivers up to 15x the throughput per megawatt of an H200 NVL8 on DeepSeek V4 Pro, and Vera Rubin NVL72 up to 10x the tokens per megawatt of GB200 NVL72. Those are chosen benchmarks at favorable operating points, but even half the claimed multiples clears 3.4×.

The gap is about what’s being sold. GPU-hours rent across a mix of training, fine-tuning and smaller models, where newer chips win by far less than on frontier mixture-of-experts inference. If you rent out GPUs by the hour, Hopper survives the end of scarcity. If you sell frontier-model tokens, it doesn’t.

The tell is the per-kilowatt rent ratio between the newest chip and Hopper. When it climbs toward 3.4×, the market has started paying for tokens rather than hours, and Hopper is done even with power to spare.

The halls don’t fit

Rack power has more than tripled from Hopper to Blackwell and is headed for about 600 kW, so most Hopper halls can’t take the racks that would replace Hopper without new electrical gear and liquid cooling. The scarce asset is the grid connection, not the building.

Rack power runs from about 30–40 kW for Hopper to 120–140 kW for GB200 and GB300 NVL72 and an estimated 190–230 kW for Vera Rubin NVL72, with Rubin Ultra’s Kyber rack at about 600 kW in 2027. Halls built for earlier densities need their power and cooling rebuilt before they can host Rubin-class racks.

The retrofit is cheap next to what the slot earns. STL Partners puts a liquid-cooling retrofit at about $2M per MW, against $11M or more for new liquid-cooled capacity. The cost that bites is time: the hall earns nothing while it’s rebuilt.

The used market has priced this in. In 2025 H100 rents fell while the median used H100 price rose, because many data centers couldn’t yet host Blackwell; the old chips were worth more to operators whose halls fit nothing newer.

So swaps start in liquid-ready halls, and air-cooled Hopper halls keep air-cooled gear until the building itself is redeveloped. Over a few generations the building becomes a consumable, rebuilt around a durable interconnect. Resale value and retrofit cost shift the line at the margin: a liquid secondary market lowers the bar to evict, and a retrofit raises it.

Where scale matters

Scale enters through the growth rate of powered capacity, not its size. If powered capacity grows by g a year and GPUs leave after L years, this year’s replacements are the deployments of L years ago, so replacement’s share of this year’s new megawatts is (1 + g)−L. It reaches half once growth slows to about 15–26% a year.

Replacement share of new GPU megawatts

Share of each year’s new GPU megawatts that replace retired ones, (1 + g)−L, by annual growth in powered capacity g and chip life L. The marker is the average growth in Goldman Sachs’s US data-center power demand from 2025 to 2027.

3-year life4-year life5-year life
0%25%50%75%100%0%10%20%30%40%50%60%Growth in powered capacity a yearUS data-center power, 2025–27: 46% a yearHalf of deployments3-year life: replacement is half of deployments at 26% growth4-year life: replacement is half of deployments at 19% growth5-year life: replacement is half of deployments at 15% growth3-year lifehalf at 26%4-year lifehalf at 19%5-year lifehalf at 15%
0%25%50%75%100%0%10%20%30%40%50%60%Power growth a yearUS power, 2025–27: 46%Half of deployments3-year life: replacement is half of deployments at 26% growth4-year life: replacement is half of deployments at 19% growth5-year life: replacement is half of deployments at 15% growth3-year lifehalf at 26%4-year lifehalf at 19%5-year lifehalf at 15%
Data
Growth a year3-year life4-year life5-year life
10%75%68%62%
15%66%57%50%
20%58%48%40%
25%51%41%33%
30%46%35%27%
46% (US, 2025–27)32%22%15%
60%24%15%10%
Half at26%19%15%

Goldman Sachs sees US data-center power demand rising from 31 GW in 2025 to about 66 GW in 2027, an average of about 46% a year. At that pace replacement is 15–32% of deployments, depending on chip life. Power scarcity shortens that life, which pulls the crossover forward.

Site size cuts the other way. Frontier training needs contiguous multi-gigawatt campuses that no legacy site can provide, so the frontier stays greenfield. In-place refresh is an inference-fleet story.

And decommissioning rarely means scrap. The efficient outcome is a cascade: hyperscalers keep dense, power-scarce slots for the newest silicon and sell older GPUs to operators with air-cooled halls or stranded power. Aggregate power demand keeps rising; the market just tiers.

What it means

The decommission wave starts at walled-off sites with liquid-ready halls, and two spreads set its timing, not the size of the build-out.

  • Rent migrates to megawatts. Where power binds, a slot is worth the newest chip’s profit, so whoever owns the interconnect captures the scarcity rent. The power-wall line has risen with every B300 price increase this year.
  • Nvidia’s demand grows a replacement leg. At 46% annual growth in powered capacity, replacement is 15–32% of deployments; at 20%, it’s 40–58%.
  • Hopper’s book value is the exposure. Amazon cut the useful life of a subset of its servers and networking gear from six years to five in January 2025, citing AI’s pace. Microsoft’s CFO says about two-thirds of its capex goes to short-lived assets, mainly GPUs and CPUs, depreciated over six years; most of that capital is contracted for most of its useful life. A walled-site swap writes Hopper off early, so useful-life changes and impairments are the accounting tell.
  • Used-GPU prices carry the cascade. It works only while buyers with power pay around $195,000 per H100 node, and residual forecasts narrow that window through 2028.

What to watch

The spread between the newest chip and Hopper, per kWh, against the newest chip’s $1.33 capital charge. Above it, walled sites should be swapping.

The ratio between them, per kW, against 3.4×. Above it, Hopper loses even with power to spare.

Hopper’s rent per kWh against $0.56. Below it, Hopper loses its slot anywhere.

Turbine lead times, which decide how many sites sit behind a wall.

Rubin’s first rents. When enough providers list it, the newest chip moves from the B300 to Rubin, and the power-wall and new-chips-idle lines reset with it. The rents behind all of these update every day in the GPU Compute Price Index.

What this is anchored on

Figures are as reported. The lines, the power per GPU, the B300’s all-in cost and the replacement shares are ours, built from these.

ItemData pointSource
GPU rentsComposite rental price by GPU and price basis at the Nov 5, 2026 16:00 UTC fixing; neocloud tier composite; term prices implied from providers’ own term-to-on-demand ratios06.ai GPU Compute Price Index
Weekly rentsWeekly median on-demand price by GPU, Nov 2025 to Nov 2026 (CC BY 4.0)GetDeploying GPU price dataset
Data-center costA 1 GW AI data center: $38B upfront, $8.5B a year all-in, servers about $5.0B a year and operations $0.9BEpoch AI
Lease ratesHyperscale about $100–150 per kW-month; wholesale colocation $150–250Build
Gas plantsNew combined-cycle plants cost $2,157/kW in 2025Bloomberg, on BNEF
Turbine pricesGE Vernova’s CEO expects full-year 2026 gas orders to price about 50% higher per kW than 2025’s (Q3 call, Oct 28, 2026)24/7 Wall St.
Turbine backlogGas Power backlog and slot reservation agreements 122 GW at the end of Q3 2026; slots sold for 2032 deliveryGE Vernova Q3 2026 results, Form 8-K
B300 serversA new 8-GPU B300 server: $400,000–450,000 at volumeAmerican Compute
Used H100sA used 8-GPU HGX H100 node about $195,000 (August 2026); conservative residuals 11–19% of list in 2027 and 5–7% in 2028; in 2025 rents fell while the median resale price roseAmerican Compute
Chips without powerMicrosoft had chips in inventory it couldn’t plug in for want of powered shells (BG2 podcast, Oct 31, 2025)Techzine
Throughput per MWGB300 NVL72 up to 15x the throughput per megawatt of H200 NVL8 on DeepSeek V4 Pro, in Nvidia’s own testsNVIDIA Technical Blog
Tokens per MWVera Rubin NVL72 up to 10x the tokens per megawatt of GB200 NVL72NVIDIA
Rack powerAbout 30–40 kW for Hopper, 120–140 kW for GB200 and GB300 NVL72, an estimated 190–230 kW for Vera Rubin NVL72, about 600 kW for Kyber in 2027ModuEdge
RetrofitsA liquid-cooling retrofit about $2M per MW, against upwards of $11M for new liquid-cooled capacitySTL Partners
Power demandUS data-center power demand 31 GW in 2025, 41 GW in 2026, 66 GW in 2027Goldman Sachs
Useful livesAmazon cut a subset of servers and networking equipment from six years to five from Jan 1, 2025Amazon 2024 Form 10-K
Useful livesMicrosoft: about two-thirds of capex on short-lived assets, mainly GPUs and CPUs, depreciated over six yearsMicrosoft FY26 Q2 call (Jan 28, 2026)
System powerDGX A100 6.5 kW, DGX H100 10.2 kW, DGX B200 14.3 kW, DGX B300 about 15 kW maximumNVIDIA DGX user guides
System power8-GPU MI300X server with 3+3 3 kW power suppliesSupermicro AS-8125GS-TNMR2

Method

The lines. Every line is a rent per kWh of IT capacity: rent per GPU-hour over the GPU’s power in kW. With E the kWh a megawatt delivers in a year, an old GPU keeps its megawatt while its rent per kWh beats (slot + upkeep) / E if new power is available; the newest GPU’s rent per kWh less its capital charge over E if power is walled off; and the newest GPU’s whole rent per kWh if frontier chips are already bought and idle. If scarcity ends and the newest GPU rents at its full cost, an old GPU survives while the newest’s rent per kW stays below (capital + slot + upkeep) / (slot + upkeep) times its own: 3.4×.

Inputs. Utilization 85% of hours, so E is 7.45 million kWh per MW-year. The slot is $3.0M a year: Epoch AI’s non-server capital cost for a 1 GW site, annualized ($2.6M per MW), plus about $0.4M for on-site gas generation. Power and upkeep are $1.2M a year: Epoch’s $0.9M of operations per MW, mostly energy, rounded up for on-site fuel and upkeep. The B300’s capital charge is $63,000 per GPU over 2.0 kW, recovered over 4 years at 10%: $9.9M per MW-year, or $1.33 per kWh. The three constants are $0.56 per kWh, $1.33 per kWh and 3.4×.

Set high on purpose. The slot and upkeep together are $4.2M a year, above Epoch’s whole non-server cost of $3.5M, and the $3.0M slot alone is above the $1.2–1.8M a year that hyperscale leases imply. A lower figure only lowers the power-available line and raises the equilibrium ratio: at Epoch’s $3.5M they would be $0.47 per kWh and 3.8×.

Power per GPU is the vendor’s 8-GPU system maximum divided by eight, plus about 10% for networking and storage: H100 1.4 kW, H200 1.4 kW, B200 1.9 kW, B300 2.0 kW, GB200 2.0 kW, A100 0.9 kW, MI300X 1.2 kW, L40S 0.6 kW, RTX PRO 6000 0.85 kW. The GB200 takes its share of a 132 kW rack, the MI300X its share of a 9 kW server; the L40S and RTX PRO 6000 are estimates.

Rents. On-demand and spot are the index’s composites (the 20% trimmed mean of each provider’s own price), neocloud is its neocloud-tier composite, and the one- and three-year prices are the median of providers’ term-to-on-demand ratios applied to the on-demand composite, all at the Nov 5, 2026 16:00 UTC fixing. They are offered prices, not transactions, with providers weighted equally. The B300’s one-year ratio rests on two providers and its three-year ratio on one.

The year of weekly rents is GetDeploying’s weekly median of each provider’s median on-demand price (CC BY 4.0), with the B300’s capital charge held at today’s $1.33 throughout.

Replacement share is (1 + g)−L in megawatts: this year’s replacements are the deployments of L years ago. Goldman’s path is uneven: 31 GW in 2025, 41 GW in 2026 and 66 GW in 2027, a 32% rise and then a 61% one; 46% is the average.

Left out. The B300’s all-in cost is an estimate: a 20% miss moves its capital charge by $0.27 per kWh. Retrofit cost, downtime, resale value, taxes and the option to wait for Rubin are outside the lines; they move them at the margin.