06.ai
Analysis · AI infrastructure

028Which neoclouds depend most on Nvidia?

Nvidia’s latest filing holds $59.5B of promises made for AI clouds: $36B of capacity it must rent if they cannot sell it, $20B of leases signed for them and $3.5B of rent guarantees. Set against each company’s own contracts, the smallest clouds lean hardest. Nvidia’s floor is 56% of Sharon AI’s contract value; its order is 5% of CoreWeave’s backlog and 13% of its debt; Nebius has no Nvidia credit at all. With Jensen Huang gone, the exposure is in what was never finished: a guarantee of more than $5B in talks for Nscale, a lease Nvidia holds under Lambda’s $34.9B Anthropic agreement, and new equity for Firmus.

Signed for AI clouds, in Nvidia’s July filing
$59.5B
$36B of capacity floors, $20B of leases to hand on, $3.5B of rent guarantees
Nvidia’s floor, share of Sharon AI’s contracts
56%
$4.9B of $8.8B; the highest of the six clouds we could measure
CoreWeave’s Nvidia order, against its debt
13%
$6.3B against $46.9B; 5% of its backlog
In talks, not signed
>$5B
A guarantee for Nscale’s Anthropic building. Lambda’s $34.9B agreement also waits on a lease Nvidia holds

What this adds

Pack 026 found that the first thing to fade after Jensen Huang is the bank of Nvidia. Nvidia announced Huang’s resignation on November 12 and Colette Kress, the finance chief, is interim chief executive (pack 026). This pack takes that one job and goes company by company. How much of each neocloud’s debt, leases, contracts and equity rests on Nvidia, and which part of it is signed?

Nvidia ties itself to a cloud in four ways, and they bind differently. It buys shares. It becomes a customer, either renting capacity for its own research or promising to rent whatever the cloud cannot sell. It puts its credit under a building, by guaranteeing the rent or by signing the lease itself to pass on. And it decides who gets chips first. The first three sit in filings and contracts, and a contract binds the company whoever runs it. Allocation, and every deal still being negotiated, were Huang’s to give.

What Nvidia has signed for AI clouds

$ billions, from Nvidia’s filing for the quarter to July 26. The filing names no partner. Strong grey is the part outside reporting attaches to a company: SemiAnalysis’s count of the three capacity deals announced so far, Hut 8’s two leases at Beacon Point in Texas, whose tenant the Financial Times reported to be Nvidia, and the rent guarantee in Nscale’s IPO filing. Grey is the rest. The $105B guarantee behind OpenAI’s Ohio campus is separate and not shown.

Attached to a named companyNo company named
0$10B$20B$30B$40BFirmus $21.1B, Sharon AI $4.2B, GMI Cloud about $2.2B (SemiAnalysis)Capacity floors: $8.5B with no company namedHut 8’s two leases at Beacon Point, $9.8B each; tenant reported to be NvidiaLeases: $0.4B with no company namedNscale, Ward County, Texas: up to $860.3MRent guarantees: $2.7B with no company namedCapacity it must rent if unsoldAI-cloud agreements, typically six years$36BLeases signed to hand onabout 15 years, starting fiscal 2028–29$20BRent guaranteesland, power and shell, five to seven years$3.5B
0$10B$20B$30B$40BFirmus $21.1B, Sharon AI $4.2B, GMI Cloud about $2.2B (SemiAnalysis)Capacity floors: $8.5B with no company namedHut 8’s two leases at Beacon Point, $9.8B each; tenant reported to be NvidiaLeases: $0.4B with no company namedNscale, Ward County, Texas: up to $860.3MRent guarantees: $2.7B with no company namedCapacity floorssix years$36BLeases to hand on15 years$20BRent guarantees5–7 years$3.5B
When the two largest lines fall due
Nvidia’s fiscal yearCapacity floorsLeases to hand on
Rest of the year to Jan 2027——
Year to Jan 2028$6B—
Year to Jan 2029$8B$1B
Year to Jan 2030$7B$1B
Year to Jan 2031$6B$1B
Later$9B$17B
Total$36B$20B

A floor, a lease and a guarantee

The largest tie is a floor under a cloud’s revenue: $36B. The filing calls these AI cloud agreements. A cloud buys Nvidia’s systems and Nvidia commits to rent the capacity, typically for six years. The cloud can stop supplying Nvidia whenever it finds a customer who pays more, and the commitment falls as it does. Where the cloud earns more than the floor Nvidia takes a share, half of revenue above a threshold according to the Wall Street Journal. Three deals have been announced. SemiAnalysis puts Nvidia’s obligation at $21.1B for Firmus, $4.2B for Sharon AI and about $2.2B for GMI Cloud, 76% of the line between them.

The floor is about half the going rate. Sharon AI describes its $4.9B as minimum revenue over six years on up to 40,000 GPUs, which works out at $2.33 per GPU-hour. Firmus’s $21.1B on up to 170,000 is $2.36. SemiAnalysis’s average for the programme is $2.35, against $4.50 to $4.60 for five-year contracts. Our own index of rental prices has the B300, the same generation of chip sold in servers, at $5.89 on spot and $9.67 on demand. A floor at 52% of the contract price is not the cloud’s profit. Firmus’s is about 1.4 times the estimated $15B cost of its chips, earned over six years, before power, buildings and interest. What it buys is a lender’s confidence that the loan will be serviced.

Then there is Nvidia’s name on the lease. Nvidia has signed about $20B of leases, of about 15 years, that it expects to hand to others, starting in its fiscal 2028 and 2029. One campus fits that description. Hut 8’s Beacon Point in Nueces County, Texas, is let on two 15-year leases of 352 MW each, worth $9.8B apiece, to a tenant Hut 8 does not name and the Financial Times identified in July as Nvidia. Nvidia has not confirmed it. Separately Nvidia guarantees up to $3.5B of rent on other clouds’ leases for five to seven years, with $712M of the tenants’ money in escrow. One of those is public: up to $860.3M on Nscale’s site in Ward County, Texas, the first five years of rent, given in return for warrants valued at $60M and with $470M of Nscale’s cash held in escrow against it.

The floor against the market

Dollars per GPU-hour. The two floors are our arithmetic: each company’s minimum spread over every GPU for the full six years. A slower ramp would make the hourly figure higher. The five-year contract range is the one SemiAnalysis sets against its GB300 figure. The index rows are the B300 in servers, from 06.ai’s GPU compute price index, seven-day averages at the November 12 fixing.

What Nvidia promises to payWhat the market pays
0$2.50$5.00$7.50$10.00Sharon AI: $4.9B ÷ (40,000 GPUs × six years of hours) = $2.33 per GPU-hourFirmus: $21.1B ÷ (170,000 GPUs × six years of hours) = $2.36 per GPU-hourFive-year contracts: $4.50 to $4.60 per GPU-hour, the range SemiAnalysis sets against its GB300 figureB300 spot, 06.ai GPU compute price index, seven-day average at November 12: $5.89B300 on demand, 06.ai GPU compute price index, seven-day average at November 12: $9.67Nvidia’s floor, impliedSharon AI$4.9B on 40,000 GPUs, six years$2.33Firmus$21.1B on 170,000 GPUs, six years$2.36MarketFive-year contractsper SemiAnalysis$4.50–4.60B300, spot06.ai index, seven-day average$5.89B300, on demand06.ai index, seven-day average$9.67
0$2.50$5.00$7.50$10.00Sharon AI: $4.9B ÷ (40,000 GPUs × six years of hours) = $2.33 per GPU-hourFirmus: $21.1B ÷ (170,000 GPUs × six years of hours) = $2.36 per GPU-hourFive-year contracts: $4.50 to $4.60 per GPU-hour, the range SemiAnalysis sets against its GB300 figureB300 spot, 06.ai GPU compute price index, seven-day average at November 12: $5.89B300 on demand, 06.ai GPU compute price index, seven-day average at November 12: $9.67Nvidia’s floorSharon AI40,000 GPUs$2.33Firmus170,000 GPUs$2.36MarketFive-year dealsSemiAnalysis$4.50–4.60B300, spot06.ai index$5.89B300, on demand06.ai index$9.67

Company by company

Debt. We found no neocloud debt that Nvidia guarantees directly. What it backs is the revenue underneath. For the three clouds in the capacity programme that is nearly everything. GMI’s Taiwan loan is capped at 55% of the value of its Nvidia contracts and Nvidia’s share of revenue is paid ahead of the banks, IFR reported; Sharon AI raised $1.6B in June to fund its side. For CoreWeave it is little. The $6.3B order for unsold capacity is 13% of $46.9B of debt, and its secured loans are sized on its customers’ contracts (W.046). Nebius and IREN have no Nvidia promise under their borrowing that we could find.

Leases. Two companies, Nscale and Lambda. Nvidia’s guarantee covers 44% of the contracted rent on Nscale’s Texas lease, $860.3M of about $1.95B, and that one guarantee is 24% of everything Nvidia has guaranteed for clouds. Lambda’s largest contract depends on a lease that is reported to be Nvidia’s. Anthropic’s August agreement, $34.9B, is for about 350 MW at Beacon Point. Anthropic’s filing of November 10 says Lambda did not secure the facility lease by the agreed date, so either side may now end the agreement (W.084). It is 70% of the $50B backlog Lambda showed investors in September. Anthropic says it does not intend to terminate.

Contracts. Where Nvidia is itself the customer, its share of contracted revenue runs from 56% at Sharon AI to 17% at IREN, 5% at CoreWeave, 3% at Lambda and 1% at Nscale, where it rents $1.2B of capacity in Europe under a 2025 agreement. Nebius has no order from Nvidia that we could find. Firmus and GMI publish no backlog to measure against.

Equity. Nscale leans hardest. Of the $3.36B it signed up in September, $2.0B is Nvidia’s, 60%: $1.0B of the convertible notes, and a further $1.0B due to close around November 16. In March Nvidia had put $777M into a round of about $2.1B. It supplied $2.0B of the $16.8B Nebius raised in the nine months to September, 12%, and $2.0B of the roughly $31.7B CoreWeave raised this year to mid-October, 6%. It took part in Firmus’s last three rounds; the Australian Financial Review reported in July that it would lead the one that closed in August with about A$720M. Its share of rounds at Lambda, Crusoe and GMI was not disclosed. IREN gave it a right to buy 30M shares at $70; the shares are near $19. Nvidia’s January purchase of CoreWeave at $87.20 a share stood 30% under water on November 11, after the shares had risen 25% that day.

Nvidia’s commitment to each company

$ billions at the value announced or filed, not what remains: orders, floors, rent guarantees and leases, not shares. Dashed bars wait on Nvidia: Nscale’s guarantee is in talks and is “more than” $5B as reported; Lambda’s is one of the two Beacon Point leases, which Lambda had not secured by the date in its Anthropic agreement. Firmus’s and GMI’s figures are SemiAnalysis’s; Sharon AI’s is its own. Firmus’s unsigned item is equity and is not drawn.

SignedWaiting on Nvidia
0$5B$10B$15B$20B$25BFloor at Batam, six years: about $21.1B (SemiAnalysis)Nvidia rents back about $1.5B of capacityOne of two $9.8B leases at Beacon Point that Nvidia is reported to hold; Lambda had not secured the lease by the date in its Anthropic agreementCapacity Nvidia rents under a July 2025 agreement, $1.2B, and a guarantee of the first five years of rent in Ward County, Texas, up to $860.3MGuarantee of more than $5B for a building at Monarch, in talks and unsigned at the end of OctoberOrder for unsold capacity through April 13, 2032: $6.3BSix-year compute collaboration: $4.9B of minimum revenueFive-year AI cloud contract: $3.4BCapacity Nvidia rents if unsold, up to six years: about $2.2B (SemiAnalysis estimate)Firmusfloor on up to 170,000 GPUs≈$21.1BLambdarent-back; lease held for its site$1.5B + $9.8BNscaleorder, rent guarantee; one in talks$2.1B + >$5BCoreWeaveorder for unsold capacity$6.3BSharon AIfloor on up to 40,000 GPUs$4.9BIRENfive-year cloud contract$3.4BGMI Cloudfloor, estimated≈$2.2BNebiusshares onlynone foundCrusoeshares onlynone found
0$5B$10B$15B$20B$25BFloor at Batam, six years: about $21.1B (SemiAnalysis)Nvidia rents back about $1.5B of capacityOne of two $9.8B leases at Beacon Point that Nvidia is reported to hold; Lambda had not secured the lease by the date in its Anthropic agreementCapacity Nvidia rents under a July 2025 agreement, $1.2B, and a guarantee of the first five years of rent in Ward County, Texas, up to $860.3MGuarantee of more than $5B for a building at Monarch, in talks and unsigned at the end of OctoberOrder for unsold capacity through April 13, 2032: $6.3BSix-year compute collaboration: $4.9B of minimum revenueFive-year AI cloud contract: $3.4BCapacity Nvidia rents if unsold, up to six years: about $2.2B (SemiAnalysis estimate)Firmusfloor≈$21.1BLambdarent-back; lease$1.5B + $9.8BNscaleorder, guarantees$2.1B + >$5BCoreWeaveorder$6.3BSharon AIfloor$4.9BIRENcontract$3.4BGMI Cloudfloor, est.≈$2.2BNebiusshares onlynone foundCrusoeshares onlynone found
CompanySharesAs a customerUnder the lease or the loanNot signed
FirmusIn each of its last three rounds; about A$720M of August’s, as reportedFloor on up to 170,000 GPUs at Batam for six years: about $21.1B (SemiAnalysis)None foundNew equity: a $2–3B private round, with Nvidia in talks for hundreds of millions
Sharon AINone foundFloor on up to 40,000 GPUs for six years: $4.9B, 56% of its contract valueNone foundNothing reported
GMI CloudIn its $223M roundRents unused capacity for up to six years: about $2.2B (SemiAnalysis). Takes half of what other customers pay, as reportedIts Taiwan loan is capped at 55% of the value of Nvidia’s contractsNothing reported
NscaleMore than 5%. $2.0B of the $3.36B signed up in September, 60%; $1.0B of it is due around November 16Rents $1.2B of capacity in Europe under a July 2025 agreement, 1% of contract valueGuarantees the first five years of rent in Ward County, Texas: up to $860.3M, 44% of the leaseA guarantee of more than $5B for a building at Monarch
LambdaAn investor since 2025; amounts not disclosedRents back about $1.5B of capacity, 3% of backlogReported to hold both leases at Beacon Point, $9.8B each, where Lambda’s Anthropic capacity is to goThe lease behind $34.9B, 70% of backlog
CoreWeaveRoughly 10–13%, as reported; $2.0B in January, 6% of what it raised this yearOrder for unsold capacity to April 2032: $6.3B, 13% of debtNone foundNothing reported
Nebius$2.0B of pre-funded warrants in March, 12% of nine months’ fundraisingNone foundNone foundNothing reported
IRENA right to buy 30M shares at $70; the shares are near $19Five-year cloud contract: $3.4B, 17% of backlogNone foundThe rest of a partnership of up to 5 GW
CrusoeOne of more than two dozen investors in its $3.9B roundNone foundNone foundNothing reported

How much of each company is Nvidia

Top: Nvidia’s own order or floor as a share of the revenue each company has under contract. The dates differ: Sharon AI at August 6, CoreWeave and Nebius at September 30, IREN at November 5, Nscale at November 12, Lambda in September as reported. Bottom: Nvidia’s money, paid or signed for, as a share of what each raised from investors and lenders over the period shown. Firmus and GMI publish neither figure.

020%40%60%Sharon AI: $4.9B floor ÷ $8.8B total contract value (Aug 6)IREN: $3.4B contract ÷ $20.3B revenue backlog (Nov 5)CoreWeave: $6.3B order ÷ $132.5B revenue backlog (Sept 30)Lambda: about $1.5B rent-back ÷ $50B backlog (September, as reported)Nscale: $1.2B agreement of July 2025 ÷ $105.8B of active and contracted value (Nov 12)Nscale: $2.0B of the $3.36B subscribed on September 15; $1.0B of it is due to close around November 16Nebius: $2.0B of pre-funded warrants ÷ $16.8B raised in the nine months to SeptemberCoreWeave: $2.0B in January ÷ about $31.7B raised in 2026 to mid-OctoberShare of contracted revenueSharon AI$4.9B of $8.8B56%IREN$3.4B of $20.3B17%CoreWeave$6.3B of $132.5B5%Lambda$1.5B of $50B3%Nscale$1.2B of $105.8B1%Nebiusnone of $38.7B0%Share of capital raisedNscaleof September’s $3.36B60%Nebiusof $16.8B in nine months12%CoreWeaveof $31.7B in 20266%
020%40%60%Sharon AI: $4.9B floor ÷ $8.8B total contract value (Aug 6)IREN: $3.4B contract ÷ $20.3B revenue backlog (Nov 5)CoreWeave: $6.3B order ÷ $132.5B revenue backlog (Sept 30)Lambda: about $1.5B rent-back ÷ $50B backlog (September, as reported)Nscale: $1.2B agreement of July 2025 ÷ $105.8B of active and contracted value (Nov 12)Nscale: $2.0B of the $3.36B subscribed on September 15; $1.0B of it is due to close around November 16Nebius: $2.0B of pre-funded warrants ÷ $16.8B raised in the nine months to SeptemberCoreWeave: $2.0B in January ÷ about $31.7B raised in 2026 to mid-OctoberShare of contractsSharon AI$4.9B of $8.8B56%IREN$3.4B of $20.3B17%CoreWeave$6.3B of $132.5B5%Lambda$1.5B of $50B3%Nscale$1.2B of $105.8B1%Nebiusnone of $38.7B0%Share of money raisedNscaleSept, $3.36B60%Nebius9 months, $16.8B12%CoreWeave2026, $31.7B6%

What Huang’s exit changes

What is signed stays signed. Nvidia’s board said on Thursday that it expects customer commitments to continue without interruption. Goldman Sachs’s James Schneider expects announced commitments to be met and thinks multi-party deals on the old scale will be much harder to arrange without Huang. A floor, an order or a guarantee is an obligation of a company that produced $69.9B of free cash flow in its first half.

What is not signed needs a yes, and the person who gives it has said no before. The Information reports that Kress pushed back on the backstop Huang first proposed for OpenAI’s Ohio campus, about $250B. The guarantee signed in August is capped at $105B. Of the financing as a whole she told investors in August that “we’re not making loans”, and that outside capital underwrites each deal. She also co-wrote the post that launched the capacity programme in July, so the programme is hers as much as his. The reported difference between them is size.

The pullback began before he left. On August 27 the Journal reported that Nvidia had paused some capacity deals. Employees had warned that the programme could draw antitrust scrutiny, and some partners had been irritated by limits on which customers they could serve. Nvidia said the model was still in place. Origin Partners’ Adil Malik told CNBC this week that for about three months Nvidia has wanted a binding letter of intent or a signed customer contract before it will backstop a client.

The vehicle meant to carry the load has not closed a deal. In August six financiers set out to raise more than $500B for Nvidia-based data centers, with Nvidia able to support up to 25% of a deal. Bloomberg reported on Thursday that none has closed, that partners want Nvidia to cover more, and that a first deal may not come before January. Rivals offer more. Broadcom backstopped more than 80% of a $35B structure for Anthropic, Reuters reported, and stands behind up to 72.5% of what is owed on a $63B one (W.046).

Washington is the other change. The Commerce Department is preparing a rule that would require licences to bring advanced chips into seven countries and make buyers disclose who uses them, The Information reported on November 11. Indonesia is one of the seven. Firmus’s Batam campus, the largest floor Nvidia has announced, is in Indonesia, is being built with Singapore’s DayOne and is due to start in the first quarter of 2027. By one account of the report, data centers run by US companies are outside the rule; Firmus is Australian. About 30% of GMI’s revenue comes from Chinese customers, The Information reported. Bankers told IFR that loans of this kind in Asia are exposed to US export controls, which could lock or downgrade the chips that secure them.

Who is most exposed

Ordered by how much of a company’s next financing step needs something from Nvidia that is not signed. The ordering is ours. It is not a forecast of who fails, and a company low on the list can still struggle to borrow for other reasons.

CompanyWhat waits on NvidiaWhy it matters now
1NscaleA guarantee of more than $5B on a 460 MW building for Anthropic, in talks since October and unsigned at the end of itIts prospectus, amended on November 12, says none of the financing its Anthropic agreements need is committed; the first building costs $10–10.5B before chips. By the FT’s reading Anthropic may leave if financing misses a deadline. About 6% of its $105.8B of contracts is active, Microsoft passed on its Texas option and the IPO has slipped.
2LambdaThe lease on about 350 MW at Beacon Point, which Nvidia is reported to holdAnthropic’s $34.9B agreement, 70% of Lambda’s backlog, has been open to termination by either side since Lambda missed the date to secure the lease. Anthropic says it does not intend to use the right. A $4B round is not reported closed.
3FirmusNew equity. It pulled a $5B IPO on October 9 and is seeking $2–3B privately; Nvidia’s part is undecidedThe floor at Batam is signed. But analysts working on the IPO put its debt at about $30B, and Batam is in Indonesia, one of seven countries in a reported US licensing rule.
4CoreWeaveNothing it has disclosedThe market trades it as Nvidia’s proxy. Its test is a loan of at least $4B that could launch as early as next week at 7–7.5%, against about 15% on its notes in October.
5NebiusNothing it has disclosedNo Nvidia credit to lose. It plans $40–45B of capex in 2027 with 75–85% of it funded, which leaves $6–11B, and has a $3.5B 364-day loan to replace.
6Sharon AI, GMI CloudLater phases of a programme the Journal says was partly paused in AugustThe most tied by share, and signed. GMI gets about 30% of its revenue from Chinese customers, which it expects to fall to about 10% next year.
7IRENThe rest of a partnership of up to 5 GWNvidia is a customer under a signed contract. IREN still has $6B of this fiscal year’s capex to fund.
8CrusoeNothingNvidia is one of more than two dozen investors in its last round. Its sites are being built for Oracle and Microsoft.

What a missing backstop costs

Lenders already price the difference. GPU-backed loans this year cost about 6% when an investment-grade customer stood behind the chips and 8–10% when none did (W.046). That is $20M to $40M a year on each $1B borrowed. CoreWeave expects its new loan, secured on a Meta contract, at 7–7.5%; its unsecured notes yielded about 15% in October.

Others can lend their credit, and each ties the cloud to a tenant. Google backstops leases for Fluidstack and for Anthropic (W.013). Broadcom finances its lab customers through its own vehicles. Customers prepay: CoreWeave expects about $9B in three months and Nebius $17–20B in 2027. What Nvidia’s floor offered was different. A loan banker in Taiwan told IFR that it lets a cloud rent to any AI company, where earlier financings needed Google, Microsoft or OpenAI as the tenant.

So the split is by business model. Clouds that rent to hyperscalers and large labs on long contracts borrow against their customers: CoreWeave, Nebius, IREN and Crusoe. Clouds that rent to many small customers borrow against Nvidia: Firmus at Batam, Sharon AI and GMI. Clouds building for one lab without an investment-grade rating need a third party’s credit, and had been getting Nvidia’s: Nscale and Lambda, both for Anthropic, which Blackstone has warned may be rated below investment grade after its IPO. For the first group Nvidia is a shareholder and a supplier, and neither changes on paper. The second keeps what it has signed and may not get more. The third is waiting for an answer.

What to watch

  • About Nov 16. Nvidia’s further $1.0B of Nscale notes or shares is due to close. It was signed on September 15 and is the nearest dated payment in this pack.
  • Nov 17. Nvidia’s results and quarterly filing. Three lines say whether the bank is still open: $36B of capacity floors, $20B of leases to hand on and $3.5B of rent guarantees at the end of July. SemiAnalysis expected the first to reach about $51B by January. A lower figure can be good news, because the commitment falls when a cloud sells the capacity to someone else.
  • Next week. CoreWeave’s loan of at least $4B, secured on chips and a Meta contract, could come to market. Management expects 7–7.5%. It would be the first large neocloud financing since Huang left.
  • About Nov 19. Anthropic’s shares are due to start trading. Anthropic is the tenant behind the contracts that Nscale and Lambda most need to finance, and Nvidia was down to buy up to $10B alongside the IPO.
  • This month. The Commerce Department’s rule on advanced chips in seven countries, Indonesia among them, if it is published as reported.
  • Before it lists. Whether Nscale’s next amendment shows financing for the Anthropic building committed, and whether an Nvidia guarantee is in it.
  • No date. Whether Lambda secures the Beacon Point lease and closes its $4B round, and whether Firmus’s private round includes Nvidia.

What this is anchored on

ItemData pointSource
NvidiaAI cloud agreements $36B, typically six years, falling as capacity is used by others; a revenue share if criteria are met; data center leases not commenced for third parties $20B, about fifteen years, starting fiscal 2028–29; land, power and shell guarantees $3.5B, reduced as partners pay over five to seven years, with $712M in escrow; SB Energy guarantees capped at $105B; Data Center revenue $48.7B hyperscale and $40.3B AI clouds, industrial and enterpriseNvidia, Form 10-Q for the quarter to July 26
NvidiaHuang’s resignation announced on November 12; Kress interim chief executive; the board expects customer commitments to continue without interruption; results on November 17Nvidia, Form 8-K, Nov 12
NvidiaWhat Huang did for customers; the commitments in total, $29B of cloud service agreements among them; up to $10B beside Anthropic’s IPO06.ai, pack 026
Capacity programmeSix-year floors at about $2.35 per GPU-hour for the GB300 against $4.50–4.60 for five-year contracts; obligations of $21.1B for Firmus, $4.2B for Sharon AI and an estimated $2.2B for GMI; the line expected near $51B by JanuarySemiAnalysis, Sep 11
Capacity programmeLaunched in July with Sharon AI and Firmus; Nvidia rents back unused GPUs at a fixed rate and shares in cloud revenueDCD, Jul 2026
Capacity programmeSome deals paused; employees’ warnings on antitrust; clouds could rent only to approved customers; half of revenue above a threshold; Nvidia says the model is still in placeReuters on the WSJ, via The Star, Aug 28
Capacity programmeFirmus expected $25–30B of committed offtake in six years; neither named deal is known to be among those pausedTNW, Aug 28
Rental pricesB300 at $5.89 spot and $9.67 on demand, seven-day averages at the November 12 fixing06.ai, GPU compute price index
FirmusA 360 MW campus at Batam, Indonesia, with DayOne; up to 170,000 GPUs; partnership through 2034Firmus, Jun 2026
FirmusThe Batam campus is due to go live in the first quarter of 2027TNW, Jun 28
FirmusNvidia in its last three rounds; more than $13B raised, about $10B of it debt; a backstop on chips estimated at $15B; talks to invest hundreds of millions in a private round of at least $2BThe Information, via Dealroom, Oct 20
FirmusNvidia to lead the round that closed in August, with about A$720MAFR, via Dealroom, Jul 9
FirmusIPO withdrawn on October 9; it sought about $5B at a $30.6B valuation; $2B raised in August at more than $10.5BCNBC, Oct 9
FirmusAnalysts working on the IPO put its debt at about $30BReuters, via Finimize, Oct 8
Sharon AITotal contract value about $8.8B at August 6; a six-year collaboration with Nvidia worth $4.9B for up to 40,000 GB300 GPUs, listed beside three other contracts worth $2.6BSharon AI, Form 8-K, Aug 6
Sharon AIThe $4.9B described as minimum revenue, an average of $817M a year, on an initial 72 MW; a floor, with revenue above it shared with NvidiaSharon AI’s August 6 call, transcript via AllMind
Sharon AI$1.6B raised in June to fund the collaboration: about $900M of shares and warrants and $700M of 4.75% convertible notesSharon AI, Jun 17
GMI CloudA Taiwan loan capped at 55% of the value of Nvidia’s contracts, drawn to 80% of server cost; Nvidia’s revenue share paid ahead of the banks; bankers on export controls and on who can be the tenantIFR, Jul 2026
GMI Cloud$223M of equity, Nvidia taking part, and a $445M credit facility; more than $600M of contracted annual revenue; Chinese customers about 30% of revenue, about 10% next yearThe Information, via Dealroom, Sep 30
GMI Cloud$947M of loan commitments; Nvidia leases unused capacity for up to six years and takes half the revenue from other customersTech in Asia, via Dealroom, Sep 2
NscaleActive and contracted value $105.8B, of which $6.4B active; Anthropic up to about $44.6B; no binding commitments for the financing those agreements need; the first Monarch building at $10–10.5B before chips, about $1B of it spent by SeptemberNscale, Form S-1/A, Nov 12
NscaleNvidia rents $1.2B of capacity under a July 2025 agreement and holds more than 5%; it guarantees up to $860.3M of rent for the first five years of the Ward County lease, for warrants valued at $60M, with $470M in escrowNscale, Form S-1/A, Nov 12
NscaleA $3.36B subscription on September 15: $2.36B of convertible notes, $1.0B of them Nvidia’s, and a further $1.0B from Nvidia to close on or around November 16; Nvidia put $400M into the Series B and $777M into a Series C of about $2.1BNscale, Form S-1/A, Nov 12
NscaleThe Ward County lease: 126 months, 234 MW, about $1.95B of rentThe Energy Mag, on Ionic Digital’s filing
NscaleMicrosoft declined its option in Texas06.ai, W.019
NscaleTalks on a guarantee of billions for a 460 MW building Anthropic is to useTechCrunch, Oct 30
NscaleBy the FT’s reading Anthropic may leave if financing misses a deadline; listing now more likely in DecemberTNW, Oct 31
NscaleThe guarantee, of more than $5B, was unsigned at the end of October; Firmus’s talks undecidedFutu News, on The Information, Nov 12
LambdaAnthropic’s three agreements, about $41.3B; the August one, $34.9B, open to termination since Lambda did not secure the facility lease by the agreed date; Anthropic does not intend to end it06.ai, W.084, from Anthropic’s S-1
LambdaBacklog $15B in June and $50B in September; a round of up to $4B at $14.5B before the moneyTechCrunch, on the WSJ, Oct 6
LambdaNvidia rents back $1.3B of capacity over four years and $200M moreTom’s Hardware, on The Information, Sep 2025
Beacon PointTwo 15-year leases of 352 MW, $9.8B each, $19.6B in all, to one unnamed high-investment-grade tenant; second-phase delivery from the second quarter of 2028Hut 8, Jul 20, via Benzinga
Beacon PointThe tenant is Nvidia, according to five peopleTNW, on the FT, Jul 28
Beacon PointLambda’s Anthropic capacity, about 350 MW, is at Hut 8’s site in Nueces County; the Journal reported that Nvidia holds the leaseReuters, via The Standard, Sep 1
CoreWeaveDebt $46.9B, backlog $132.5B, interest 2.2 times adjusted operating income, about $9B of prepayments expected06.ai, W.076
CoreWeaveDefault-swap record of 1,267.9 basis points on November 506.ai, W.029
CoreWeaveAbout $31.7B raised in 2026 to October 16, $3B of it equity; its 2031 notes at a 15.1% yield that day06.ai, pack 002
CoreWeaveA loan of at least $4B backed by chips and a Meta contract, which could be marketed from the week of November 16; management expects 7–7.5%; no unsecured debt at current yieldsTheStreet, Nov 13
CoreWeaveNvidia bought $2B of shares at $87.20 in January; its stake put at roughly 10% to 12.8%TipRanks, Nov 12
CoreWeaveShares at $60.77 on November 11, up 25%Stocktwits, Nov 12
CoreWeaveNvidia’s order requires it to buy unsold capacity through April 13, 2032Reuters, via The Star, Sep 2025
Nebius$16.8B raised in nine months, $2.0B of it pre-funded warrants; debt $14.2B; remaining obligations $38.7B; 2027 capex, funding and prepayments; a $3.5B 364-day facility06.ai, W.096
NebiusNvidia’s $2B came as pre-funded warrants over 21.1M sharesTNW, Mar 12
IRENRevenue backlog $20.3B; debt $10.2B; $6B of capex still to fund06.ai, W.021
IRENA five-year, $3.4B contract and a five-year right to buy 30M shares at $70; a partnership of up to 5 GWSharecast, via LSE, May 8
IRENShares at $19.37 in early trading on November 12Moneycontrol, via TradingView, Nov 12
Crusoe$3.9B raised at a $30.9B valuation, Nvidia among more than two dozen investors; sites for Oracle and MicrosoftSiliconANGLE, Sep 17
After HuangGoldman’s James Schneider expects announced commitments to be met and the next multi-party deals to be much harderCNBC, Nov 13
After HuangKress pushed back on a proposed $250B backstop for OpenAIFortune, on The Information, Nov 12
After HuangUntil about three months ago a non-binding letter of intent was enough for a backstop; Nvidia now wants a binding one or a signed contract; the Ohio guarantee was discussed at $250BFinanceFeeds, on CNBC, Nov 12
After HuangKress in August: “we’re not making loans”; outside capital underwrites each dealTNW, Aug 27
After HuangKress co-wrote the post that launched the capacity programmeTom’s Hardware, Jul 2
Financing platformsSix firms aiming at more than $500B; Nvidia may backstop up to 25%Reuters, via Khaleej Times, Aug 12
Financing platformsNo deal in months; customers and partners asking Nvidia for a larger backstop; a first deal no earlier than JanuaryBloomberg, Nov 12
Financing platformsLenders want more than the 25% Nvidia outlined; Broadcom backstopped more than 80% of a $35B structure for AnthropicReuters, via Calcalist, Oct 3
CreditGPU loans at about 6% with an investment-grade customer and 8–10% without; Broadcom’s backstop of up to 72.5% of what is owed on a $63B lease financing06.ai, W.046
CreditGoogle’s backstops for Fluidstack’s and Anthropic’s leases06.ai, W.013
CreditBlackstone’s warning that Anthropic may be rated below investment gradeTechCrunch, Oct 30
AnthropicTrading expected to start around November 1906.ai, W.073
Export ruleA Commerce rule in preparation covering Singapore, Malaysia, Thailand, Indonesia, Brazil, Norway and South Africa: licences for advanced chips and disclosure of end users; data centers run by US companies exempt on conditions; it could be announced in NovemberForbes, on The Information, Nov 12

Method

What we read. Nvidia’s quarterly filing itself, for the three lines and the guarantees; pack 026 had used others’ transcriptions of it. Company filings and releases for Sharon AI, CoreWeave, Nebius, IREN and Hut 8. Nscale’s prospectus as amended on November 12, read directly; its figures replace those W.019 took from the first filing. Anthropic’s as read for W.084. Firmus, GMI, Lambda and Crusoe are private, and what is here about them is press reporting, named in the table above.

Estimates. $21.1B, $4.2B and about $2.2B are SemiAnalysis’s counts of Nvidia’s obligations; Nvidia’s filing gives only the $36B total, so $8.5B has no name on it. Sharon AI’s own figure for its agreement is $4.9B, which we use for its shares and its bar. Floors per GPU-hour: $4.9B ÷ (40,000 × 6 × 8,760) = $2.33; $21.1B ÷ (170,000 × 6 × 8,760) = $2.36. Both assume every GPU for the whole term. The filing names no counterparty in any line. Beside the three lines it lists $29B of cloud service agreements, compute Nvidia rents for itself (pack 026). We do not know which line holds CoreWeave’s order or what Nvidia rents from IREN, Lambda and Nscale, so those come from the companies’ own disclosures and press reports and are not added to the $59.5B.

Shares. $4.9B ÷ $8.8B = 55.7%; Sharon AI’s release lists the agreement beside three other contracts worth $2.6B and does not break the total down, so we take the $4.9B to be inside it. $3.4B ÷ $20.3B = 16.7%. $6.3B ÷ $132.5B = 4.8%, and ÷ $46.9B = 13.4%; we do not know whether Nvidia’s order is inside CoreWeave’s reported backlog. $1.5B ÷ $50B = 3%; $34.9B ÷ $50B = 69.8%, which sets a figure from Anthropic’s filing against a backlog reported from a letter to investors. $1.2B ÷ $105.8B = 1.1%, taking Nvidia’s agreement to be inside Nscale’s total. $860.3M ÷ about $1.95B = 44.1%. $2.0B ÷ $3.36B = 59.5%; $777M ÷ about $2.1B = 37%. $2.0B ÷ $16.8B = 11.9%. $2.0B ÷ $31.7B = 6.3%, on pack 002’s tally of 2026 financings to October 16.

Beacon Point. That Nvidia’s $20B of leases is Hut 8’s campus is our reading. The amounts ($19.6B), the term (15 years) and the start dates match, and the FT and the Journal report Nvidia as the tenant. Neither company has said so, and Anthropic’s filing does not name the site whose lease Lambda missed; press reports place it at Beacon Point. Why Lambda missed the date is not public.

Not covered. Who gets Vera Rubin first, which may matter more to these companies than any of the above (pack 016). The $105B guarantee for OpenAI’s Ohio campus and Nvidia’s stakes in the labs (pack 026). Terms of private agreements we could not see. Whether any of the capacity deals paused in August has resumed.