06.ai
Analysis · Nvidia

026How long can Nvidia run without Jensen Huang?

Jensen Huang resigned on November 12 and Nvidia’s finance chief is running the company. About two years of it are already decided: revenue for the year to January 2028 is capped by supply at about 70% growth, three chip generations are defined and $279B of supply is on order. What decays first is what Huang did for everyone else: rationing chips, lending Nvidia’s balance sheet ($189.5B committed for customers, with about $240B more under discussion) and dealing with governments. At about $165 the shares cost 10.4 times next fiscal year’s expected earnings, against 15.0 at October’s record. That price fits a plateau in AI spending or a botched succession, but not both.

Since the October 6 record
−31%
$239.24 to about $165; about $1.79T of market value
Price to next year’s expected earnings
10.4×
15.0× at the record; analysts’ new targets imply 12.6–14.1×
Next year’s revenue growth, capped by supply
≈70%
Nvidia’s outlook for the year to January 2028; it says demand is nearer double
Commitments and guarantees
$530.5B
$189.5B of it for customers; about $240B more was not yet signed

What happened

Nvidia said on Thursday morning that Jensen Huang had resigned as president, chief executive and director, effective immediately. Colette Kress, finance chief since 2013, becomes interim chief executive and keeps the finance job. Harvey Jones, a director since 1993, becomes the company’s first board chair. The board will consider internal and external candidates and gave no timetable. It gave no reason either. The resignation followed two weeks of reporting on Huang’s personal conduct and a board inquiry, opened on November 8, into reports that he had been the target of a foreign intelligence effort; W.054 and W.087 set out what was reported. This pack adds nothing to those reports. It is about what Nvidia, and the companies built around it, lose.

The shares opened 13% lower and won back more than half of it. They opened at $150.99, touched $148.80 and were near $165 by late morning, 5% below Wednesday’s $173.73 close and 31% below the record close of October 6. On about 24.1B shares that is about $1.79T of market value in five weeks.

More than half of that is Nvidia’s own. Chip stocks fell together after the midterm elections (W.026) and then recovered: from November 6, the last close before the board announced its inquiry, to Wednesday the PHLX chip index rose about 12% while Nvidia fell 7%. Had Nvidia kept pace it would have closed Wednesday near $210. At $165 it is 21% below that, about $45 a share or $1.08T. An analyst once put the cost of losing Steve Jobs at a quarter of Apple’s value. The market has charged Nvidia about that.

Nvidia’s share price since June

Daily closes, with about $165 on the morning of November 12 (open circle). The dashed grey line is where Nvidia’s November 6 close would have gone had it moved with the PHLX chip index to November 11. The New York Times first reported on October 29 that US officials believed Huang had been targeted.

NvidiaAt the chip index’s pace from November 6
$150$175$200$225$250JunJulAugSepOctNovFirst report, Oct 29Record close, October 6: $239.24The November 6 close moved with the chip index to November 11: about $210November 11 close: $173.73November 12, at about 10:50 a.m. in New York on November 12: about $165Record$239.24Index pace$210Nov 12≈$165
$150$175$200$225$250JunJulAugSepOctNovOct 29Record close, October 6: $239.24The November 6 close moved with the chip index to November 11: about $210November 11 close: $173.73November 12, at about 10:50 a.m. in New York on November 12: about $165Record$239.24Index pace$210Nov 12≈$165

Five jobs, decaying at different speeds

Nvidia has no second-in-command. An internal chart seen by Business Insider in October 2025 showed 36 people reporting to Huang, down from 55, and accounts this week put the number near 60; he has said he avoids one-to-one meetings so that everyone hears the same thing. That design puts every cross-company decision in one head. Apple in 2011 passed to an operating chief who had already run the company through three medical leaves. Nvidia passes, for now, to its finance chief. Its annual report names no key person. It says the company is highly dependent on its longstanding executive team and lists a failure of succession planning among its risks.

He did at least five jobs, and they do not wear off at the same rate. The two that set Nvidia’s own results for the next two years, the roadmap and the supply chain, are the slowest to fade because they are written into tape-outs and purchase orders. The three that mattered most to everyone else, deciding who gets chips, who gets Nvidia’s credit and what governments will allow, were personal and stop now. Allocation was personal enough that Larry Ellison has described asking Huang for chips over dinner.

What Huang did, and how long each part lasts without him

JobWhat it wasWhat is leftWears off in
ArchitectA new architecture every year; 36 people reporting to him and no deputyThree generations already defined, and the engineers who built themTwo to three years
Supply-chain principalTSMC’s largest customer, 19% of its 2025 revenue; $279B of supply on orderThe contracts and the scaleTwo years, then at the margin
AllocatorCustomers want about twice this year’s volume and supply allows 70% more, so each shipment is a choice of customerPurchase orders for the next few quartersMonths
Banker$189.5B of guarantees, buy-backs, leases and equity committed for customers; a $99B portfolio of 242 stakesEverything already signedAt once, for anything not signed
DiplomatExport licences, sovereign buyers and the White House, in person; the outlook already assumes no data center chips sold to ChinaThe licences in handAt once

How long the rails run

The year to January 2028 is unusually well protected. In August Kress told investors to expect revenue growth of about 70% and said supply, not demand, sets that figure at least through that year: customers’ forecasts pointed to demand roughly doubling. Analysts have $692B for the year, on estimates from $507B to $779B. Doubling this year’s $412B would be about $823B, so about 16% of next year’s demand, $131B, could disappear before a chip went unsold. Kress also said the demand from AI labs that Nvidia supports with its own balance sheet is about a quarter of next year’s business, about $173B. The cushion covers three-quarters of it.

The supply is bought. Nvidia had $279B of supply and capacity on order at the end of July, up from $119B three months earlier and $16B at the start of 2025: mostly memory, wafers and packaging, with $92B falling due by January and $87B in the year after. TSMC’s annual report shows its largest customer, read as Nvidia, at 19% of 2025 revenue, up from 12%, and Morgan Stanley has Nvidia taking about 45% of 2027’s advanced packaging. The relationship is nearly three decades old and was personal: it began with a letter Huang wrote to Morris Chang in 1997, and Chang’s memoir says he offered Huang his own job in 2013. The orders are not, and at this size they outlast him. They also cut the other way. If demand did fall, Nvidia would still owe for the parts.

Three generations are defined. Vera Rubin’s six chips taped out by August 2025 and went into production a year later; Kress expected it to be about a fifth of data center revenue in the quarter just ended. Rubin Ultra is due in 2027 and Feynman in 2028, on the roadmap Huang showed in March. On Rubin’s timing a chip’s design is frozen about a year before it ships and its architecture well before that, so Feynman is Huang’s design, finished by someone else. The first generation defined without him would ship in 2029 or 2030.

So is the capital return. The board added $150B to the buyback on September 28, leaving $235B to be used by January 2028. At $165 that is 5.9% of the company.

What is not on rails is people, and the decisions still in flight. Nvidia reported staff turnover of 2.7% in fiscal 2024. That loyalty was built with stock now 31% below its high and by a founder who has left; Oppenheimer’s downgrade cites the risk of departures. California does not enforce non-compete agreements, and Elon Musk has said he would be honoured to hire Huang. Nor is the half of the data center business that is not the hyperscalers on rails: $40B last quarter against their $49B, growing twice as fast, and sold by Huang deal by deal to AI clouds, governments and labs. Open decisions include Rubin Ultra’s memory configuration, which SemiAnalysis reports is still moving (pack 012), next year’s prices, and which customers get backed.

What is already decided

Each chip sits in its launch year on Nvidia’s roadmap; the shaded years are those whose products would be defined after Huang. The strong grey bars are commitments with dates on them. The dashed line is November 12, 2026.

Defined under HuangNot yet definedCommitted, with an end date
Defined after Huang20262027202820292030Chips, by launch yearVera Rubinin production since AugustVera Rubin, 2026: Six chips taped out by August 2025; production shipments since August 2026; expected to be about a fifth of data center revenue in the quarter to OctoberRubin Ultraannounced in March, on the Kyber rackRubin Ultra, 2027: Shown at GTC in March on the Kyber rack; memory configuration reported still to be movingFeynmanon the roadmap, with the Rosa CPUFeynman, 2028: On the roadmap with the Rosa CPU; on Vera Rubin’s timing, tape-out about a year before productionThe next one, not yet nameddue at the annual cadenceNot yet named, 2029: Due at the annual cadence; its architecture is being set nowMoneySupply on order, $279B$92B due by January, $87B the year afterSupply and capacity commitments of $279B at July 26, 2026: $92B due in the rest of the year to January 2027 and $87B in the year afterRevenue capped by supplyabout 70% growth, Nvidia’s outlookYear to January 2028: Nvidia’s outlook of about 70% revenue growth, which it calls supply-constrainedBuyback, $235Bto be carried out by January 2028$235B of repurchase authorization after $150B was added on September 28; Nvidia expects to use it through the year to January 2028Nov 12
After Huang20262027202820292030Chips, by launch yearVera Rubinshipping since AugVera Rubin, 2026: Six chips taped out by August 2025; production shipments since August 2026; expected to be about a fifth of data center revenue in the quarter to OctoberRubin UltraannouncedRubin Ultra, 2027: Shown at GTC in March on the Kyber rack; memory configuration reported still to be movingFeynmanon the roadmapFeynman, 2028: On the roadmap with the Rosa CPU; on Vera Rubin’s timing, tape-out about a year before productionNot yet namedbeing definedNot yet named, 2029: Due at the annual cadence; its architecture is being set nowMoneySupply on order$279BSupply and capacity commitments of $279B at July 26, 2026: $92B due in the rest of the year to January 2027 and $87B in the year afterRevenue cappedby supply, about +70%Year to January 2028: Nvidia’s outlook of about 70% revenue growth, which it calls supply-constrainedBuyback$235B to Jan 2028$235B of repurchase authorization after $150B was added on September 28; Nvidia expects to use it through the year to January 2028Nov 12
The roadmap as a table
GenerationLaunchWhere it standsWhose decisions
Vera Rubin2026Six chips taped out by August 2025; production shipments since August 2026; expected to be about a fifth of data center revenue in the quarter to OctoberHuang
Rubin Ultra2027Shown at GTC in March on the Kyber rack; memory configuration reported still to be movingHuang, with decisions still open
Feynman2028On the roadmap with the Rosa CPU; on Vera Rubin’s timing, tape-out about a year before productionDesigned under Huang, finished under a successor
Not yet named2029Due at the annual cadence; its architecture is being set nowThe successor

The bank of Nvidia

The commitments and guarantees in Nvidia’s latest filing add up to $530.5B, and $189.5B of that was made for customers. The rest, $341B, is for its own supply and operations. The largest item for a customer is a guarantee of up to $105B, entered in August, behind the Ohio campus that SB Energy is building for OpenAI to rent. Another $36B obliges Nvidia to buy capacity from AI clouds if they cannot sell it; CoreWeave’s $6.3B order, which runs to April 2032, is one such. Nvidia also holds about $99B of stakes in 229 private and 13 public companies by Hunterbrook’s count, has put nearly $50B into frontier labs, and borrowed $25B in June. On the charge that this is circular financing, Huang said in August “we see it differently”: the compute can be redeployed, so the risk is limited.

About $240B more was under discussion and unsigned. A preliminary agreement to put $100B of equity into OpenAI in ten installments tied to chip orders. A backstop of up to a quarter of the $500B that six financiers (Apollo, BlackRock, Blackstone, Brookfield, Goldman Sachs and KKR) aim to raise for Nvidia-based data centers, a figure Huang gave in a post and no filing contains. Up to $10B beside Anthropic’s IPO. Talks on more than $5B of guarantees for Nscale. None of it binds the company. Each item needs someone to say yes, and that person is now an interim chief with an inquiry open and every reason to be careful. UBS estimates a pause could take about $50B out of the ecosystem for a time.

The comparison people reach for is J.P. Morgan, who decided in 1907 which banks would be saved. He died in March 1913 and the Federal Reserve Act was signed that December: the function outlived the man by becoming an institution. That is already under way here. Broadcom finances its two lab customers through a vehicle with Apollo and Blackstone, whose first tranche was $35B. Alphabet’s backstops for partners’ leases reached $48B in September (W.090). The six-firm platform was to be Nvidia’s version, and whether it is signed with Nvidia’s backstop is the first thing to watch.

Against revenue the support is large; against cash flow it is not. Lucent’s financing commitments to customers peaked at $8.1B in 2000, about 24% of a year’s revenue. Nvidia’s $189.5B is 46% of this fiscal year’s expected revenue. But analysts expect $190B of free cash flow this year and $327B next, which Lucent never had. The exposure that matters is its concentration in a few labs without investment-grade credit, OpenAI above all.

Nvidia’s commitments and guarantees

$ billions. Signed items are from the filing for the quarter to July 26, as tabulated by FourWeekMBA and Hunterbrook; the Ohio guarantee was entered in August and is a maximum. The dashed bars were reported or preliminary and appear in no filing; “up to” and “more than” are as reported.

For Nvidia’s own supply and operations, $341BOn behalf of customers, $189.5BNot signed, about $240B
0$100B$200B$300BSupply and capacity (memory, wafers, packaging): $279BGuarantees for OpenAI’s Ohio campus (to SB Energy, maximum): $105BAI-cloud agreements (capacity Nvidia must buy if unsold): $36BCloud service agreements (compute Nvidia rents): $29BData center leases, its own (not yet started): $25BEquity investments (committed, not yet paid): $25BLeases signed for partners (to be reassigned): $20BCapital expenditure: $8BOther lease guarantees (for AI clouds): $3.5BFinancing platforms’ backstop (up to 25% of $500B, per Huang): ≤$125B; not in any filingOpenAI equity (preliminary, ten installments): $100B; not in any filingAnthropic placement (up to, at the IPO): ≤$10B; not in any filingNscale guarantees (more than, in talks): >$5B; not in any filingSigned, in the July filingSupply and capacitymemory, wafers, packaging$279BGuarantees for OpenAI’s Ohio campusto SB Energy, maximum$105BAI-cloud agreementscapacity Nvidia must buy if unsold$36BCloud service agreementscompute Nvidia rents$29BData center leases, its ownnot yet started$25BEquity investmentscommitted, not yet paid$25BLeases signed for partnersto be reassigned$20BCapital expenditure$8BOther lease guaranteesfor AI clouds$3.5BReported, not signedFinancing platforms’ backstopup to 25% of $500B, per Huang≤$125BOpenAI equitypreliminary, ten installments$100BAnthropic placementup to, at the IPO≤$10BNscale guaranteesmore than, in talks>$5B
0$100B$200B$300BSupply and capacity (memory, wafers, packaging): $279BGuarantees for OpenAI’s Ohio campus (to SB Energy, maximum): $105BAI-cloud agreements (capacity Nvidia must buy if unsold): $36BCloud service agreements (compute Nvidia rents): $29BData center leases, its own (not yet started): $25BEquity investments (committed, not yet paid): $25BLeases signed for partners (to be reassigned): $20BCapital expenditure: $8BOther lease guarantees (for AI clouds): $3.5BFinancing platforms’ backstop (up to 25% of $500B, per Huang): ≤$125B; not in any filingOpenAI equity (preliminary, ten installments): $100B; not in any filingAnthropic placement (up to, at the IPO): ≤$10B; not in any filingNscale guarantees (more than, in talks): >$5B; not in any filingSignedSupply and capacity$279BOpenAI guarantees$105BAI-cloud agreements$36BCloud services$29BOwn leases$25BEquity investments$25BLeases for partners$20BCapex$8BOther guarantees$3.5BNot signedPlatform backstop≤$125BOpenAI equity$100BAnthropic placement≤$10BNscale guarantees>$5B

What happened to the others

No earlier case matches on all four counts: a founder, the company’s chief innovator, at the peak, overnight. Jobs in 2011 was the first three, but he had been ill for years and handed over to a deputy. Gates in 2000 was a founder at the peak who chose his moment and stayed as chairman. Krzanich at Intel and Hurd at HP left overnight over conduct and were replaced for a time by finance chiefs, but neither had founded the company. Jobs in 1985 was forced out abruptly, from a company that was not at a peak.

The businesses kept growing. Apple’s revenue went from $108.2B in the year Jobs resigned to $233.7B four years later. Microsoft’s more than tripled under Ballmer and its profit more than doubled. Even after 1985 Apple grew from $1.9B to $11.1B in ten years on the Macintosh before it nearly failed.

What investors would pay for them did not. From the day Jobs resigned to April 18, 2013, Apple’s trailing earnings per share rose 66% and its share price 4%: the multiple fell from 14.9 to 9.4. Microsoft’s market value fell from $604B to $269B over Ballmer’s 13 years while its profit rose 133%.

Product and margin slowed inside two years. Apple’s sales growth went from 45% in fiscal 2012 to 9% and 7% in the next two years, and its gross margin from 43.9% to 37.6% in one. Its first new category, the Watch, arrived 44 months after Jobs left. What Cook added was financial. From fiscal 2012 to 2023 Apple’s net income rose 2.3 times and its earnings per share 3.9 times, because the share count fell 40%.

Where it went wrong, the successor was the problem. Intel made its interim finance chief permanent after seven months, though he had said he was not a candidate. In July 2020 it disclosed that its next manufacturing process was six months late; the shares fell 16% in a day and AMD’s rose 17%. HP hired an outsider who lasted 11 months. TSMC, which Morris Chang handed to two engineers after years of preparation, has grown its revenue about 3.7 times since. Yahoo Finance counts six chief executives removed over conduct: the median first-day move was −3%, and four of the six lagged the S&P 500 over the next year, by a median of about 12 points. Nvidia’s 13% opening fall was outside the range of all six.

Earnings kept rising. The value did not

Change in earnings (strong grey) and in what the market paid (pink) after two founders stepped back at a peak. Apple: trailing four-quarter earnings per share and share price, Aug 24, 2011 to Apr 18, 2013. Microsoft: annual net income and market value, January 2000 to August 2013.

EarningsShare price or market value
−50%0+50%+100%+150%Apple trailing four-quarter earnings per share: $25.26 at Aug 24, 2011, $41.89 at Apr 18, 2013Apple share price: $376.18 on Aug 24, 2011, $392.05 on Apr 18, 2013Microsoft net income: $9.4B in fiscal 2000, $21.9B in fiscal 2013Microsoft market value: $604B in January 2000, $269B in August 2013 (FactSet, via AP)Apple, 20 months onEarnings per share+66%Share price+4%Microsoft, 13 yearsNet income+133%Market value−55%
−50%0+50%+100%+150%Apple trailing four-quarter earnings per share: $25.26 at Aug 24, 2011, $41.89 at Apr 18, 2013Apple share price: $376.18 on Aug 24, 2011, $392.05 on Apr 18, 2013Microsoft net income: $9.4B in fiscal 2000, $21.9B in fiscal 2013Microsoft market value: $604B in January 2000, $269B in August 2013 (FactSet, via AP)Apple, 20 monthsEarnings a share+66%Share price+4%Microsoft, 13 yearsNet income+133%Market value−55%
CompanyWho left, and howWho followedWhat followed
Apple, 1985Steve Jobs, co-founder, forced out by the boardJohn Sculley, already chief executiveRevenue rose from $1.9B to $11.1B in ten years on the Macintosh. Then the company nearly failed and Jobs came back.
Microsoft, 2000Bill Gates hands over at the peak and stays as chairmanSteve Ballmer, his deputyRevenue $23B to $77.9B and net income $9.4B to $21.9B by 2013. Market value $604B to $269B; $1,000 became $767 with dividends.
HP, 2010Mark Hurd resigns after a conduct and expenses inquiryThe finance chief as interim, then an outsider who lasted 11 monthsThe shares had their largest fall in six years and lagged the S&P 500 by nearly 40 points over the next year.
Apple, 2011Jobs resigns, ill, at the peakTim Cook, the operating chief who had run the company during his leavesRevenue $108.2B to $233.7B in four years; the first new category 44 months later. In the first 20 months earnings per share rose 66% and the share price 4%.
Intel, 2018Brian Krzanich resigns over a past relationship with an employeeThe finance chief as interim, made permanent after seven monthsIts next process ran six months late in 2020 and the shares fell 16% in a day. AMD’s share of server processors went from about 1% to 27%.
TSMC, 2018Morris Chang retires at 86 after a planned handoverTwo engineers, as chairman and chief executiveRevenue up about 3.7 times by 2025, with Nvidia its largest customer.

How far behind the others are

On the last public benchmark, AMD’s best measured chip did per megawatt what Nvidia’s 2024 chip did. SemiAnalysis’s InferenceX has AMD’s MI355X at 2.01M tokens a second per megawatt on an agentic workload, against 2.26M for Nvidia’s H200, 28.5M for a GB300 rack and 59.4M for a Vera Rubin rack on pre-release software. The gap is the rack: 14 times, then 30. AMD had no rack-scale system until Helios, which first shipped in the quarter to September, more than a year after Nvidia’s first racks. Helios has no public result yet. AMD says its MI455X chip leads on compute, memory and bandwidth.

In revenue AMD is about three years behind. Its data center segment, processors included, will be about $34B this year and at least $75B in 2027 on its own guidance. Nvidia sold $96B in its July quarter alone. AMD’s whole 2027, at least $94B, is about three-quarters of what Nvidia sold in the year to January 2025.

The nearer rival is custom silicon. Broadcom expects AI revenue of $58B this fiscal year, about $115B next and $230B the year after, and says the supply for both is secured. On current outlooks that takes Broadcom from 14% of Nvidia’s revenue to 25% in two years. Its chief executive says the chip it builds for OpenAI is comparable to Vera Rubin on OpenAI’s own workloads and that custom chips cost less than half as much, claims with no public benchmark behind them. The buyers’ contracts say more. Of the $644B in Anthropic’s seven largest disclosed compute contracts, 61% is with Broadcom, Google and Amazon, largely on their own chips, and 39% is on Nvidia’s (W.001).

So how many years to parity? On the chip, AMD says none. On the system, about one generation, 12 to 18 months, and with both companies on an annual cadence that gap holds unless Nvidia misses a beat. That is the part the succession decides. On software the moat is being drained from outside: Lisa Su said Anthropic used Claude to bring a model up on AMD racks in a weekend. On volume it is not close: AMD’s whole 2027 is one Nvidia quarter, and what it can ship is set by the same TSMC and memory lines Nvidia has booked. Intel shows how slowly a leader loses even after a slip: AMD’s share of server processors went from about 1% in 2017 to 27% of units and 41% of revenue by mid-2025, three to four points a year.

Tokens per megawatt, by chip

Tokens a second per megawatt of utility power, serving DeepSeek V4 Pro at 100 tokens a second per user, in millions, from SemiAnalysis’s InferenceX in September; values are interpolated between measured points and the Vera Rubin figure used pre-release software. AMD’s Helios rack and Broadcom’s custom chips have no public result. The label under each name is the maker and the year it shipped.

NvidiaAMD
020M40M60MVera Rubin NVL72 (Nvidia rack, 2026): 59.4M tokens a second per megawattGB300 NVL72 (Nvidia rack, 2025): 28.5M tokens a second per megawattB200 (Nvidia, 2025): 6.95M tokens a second per megawattB300 (Nvidia, 2025): 5.56M tokens a second per megawattH200 (Nvidia, 2024): 2.26M tokens a second per megawattMI355X (AMD, 2025): 2.01M tokens a second per megawattVera Rubin NVL72Nvidia rack, 202659.4MGB300 NVL72Nvidia rack, 202528.5MB200Nvidia, 20256.95MB300Nvidia, 20255.56MH200Nvidia, 20242.26MMI355XAMD, 20252.01M
020M40M60MVera Rubin NVL72 (Nvidia rack, 2026): 59.4M tokens a second per megawattGB300 NVL72 (Nvidia rack, 2025): 28.5M tokens a second per megawattB200 (Nvidia, 2025): 6.95M tokens a second per megawattB300 (Nvidia, 2025): 5.56M tokens a second per megawattH200 (Nvidia, 2024): 2.26M tokens a second per megawattMI355X (AMD, 2025): 2.01M tokens a second per megawattVera Rubin NVL72Nvidia rack, 202659.4MGB300 NVL72Nvidia rack, 202528.5MB200Nvidia, 20256.95MB300Nvidia, 20255.56MH200Nvidia, 20242.26MMI355XAMD, 20252.01M

Revenue on each company’s own outlook

$ billions, three years each, lighter to darker. Nvidia is all revenue on analysts’ consensus (it guides to about 70% growth in the middle year); Broadcom is AI chips only, on its own outlook; AMD is its data center segment, from three reported quarters, its guidance and its statement that 2027 revenue grows more than 80% with data center above 80% of it. Fiscal years differ: Nvidia’s end in January, Broadcom’s around November, AMD’s in December.

This yearNext yearThe year after
0$250B$500B$750B$1TNvidia, To Jan 2027: $412B (analysts’ consensus; Nvidia guides to about 70% growth in the second year)Nvidia, To Jan 2028: $692B (analysts’ consensus; Nvidia guides to about 70% growth in the second year)Nvidia, To Jan 2029: $903B (analysts’ consensus; Nvidia guides to about 70% growth in the second year)Broadcom, Fiscal 2026: $58.0B (company outlook)Broadcom, Fiscal 2027: $115B (company outlook)Broadcom, Fiscal 2028: $230B (company outlook)AMD, 2026: $33.9B (three reported quarters and guidance; at least 80% of at least 80% more revenue in 2027)AMD, 2027: $75.1B (three reported quarters and guidance; at least 80% of at least 80% more revenue in 2027)Nvidia, all revenueTo Jan 2027$411.7BTo Jan 2028$692.2BTo Jan 2029$903.2BBroadcom, AI chipsFiscal 2026$58BFiscal 2027$115BFiscal 2028$230BAMD, data center2026$33.9B2027≥$75.1B2028no outlook given
0$250B$500B$750B$1TNvidia, To Jan 2027: $412B (analysts’ consensus; Nvidia guides to about 70% growth in the second year)Nvidia, To Jan 2028: $692B (analysts’ consensus; Nvidia guides to about 70% growth in the second year)Nvidia, To Jan 2029: $903B (analysts’ consensus; Nvidia guides to about 70% growth in the second year)Broadcom, Fiscal 2026: $58.0B (company outlook)Broadcom, Fiscal 2027: $115B (company outlook)Broadcom, Fiscal 2028: $230B (company outlook)AMD, 2026: $33.9B (three reported quarters and guidance; at least 80% of at least 80% more revenue in 2027)AMD, 2027: $75.1B (three reported quarters and guidance; at least 80% of at least 80% more revenue in 2027)Nvidia, all revenueTo Jan 2027$411.7BTo Jan 2028$692.2BTo Jan 2029$903.2BBroadcom, AI chipsFiscal 2026$58BFiscal 2027$115BFiscal 2028$230BAMD, data center2026$33.9B2027≥$75.1B2028no outlook given

What slowing down would cost

Two questions are easy to confuse. One is how much the industry buys. The other is what a change of leadership costs Nvidia within that. We run three paths for each. For demand: the analysts’ path ($692B then $903B, then 12% and 6% growth, which is pack 010’s accelerator spending less three points of share a year); a plateau, where revenue stops growing after January 2028 as in pack 022; and a digestion, where it falls 25%, then 10%, then recovers 10%. For succession: the handover holds, as at Apple in 2011 or TSMC in 2018; drift, where revenue runs 3%, 7% and 11% below the path in the three years to January 2031 and gross margin gives up as much as 2.5 points, about the pace at which Intel lost servers; and disorder, with departures and a late generation, where the shortfall reaches 25% and 5.5 points.

A point of share is worth 22 cents. On the analysts’ path, 1% of revenue in the year to January 2029 is $9.0B and $0.22 of earnings per share. A point of gross margin is $0.31.

Succession moves value by 13% to 30%. Demand moves it more. With the handover holding, a rough present value runs from $227 a share on the analysts’ path to $148 on the plateau and $107 in a digestion. On any of them drift takes off about 13% and disorder about 30%.

At $165 the market is charging for one of the two problems, not both. The price sits a little above the plateau with a clean handover ($148) and the analysts’ path with disorder ($159). Both at once would be $103. Put our own weights on the nine cells, 35%, 45% and 20% on the demand paths and 45%, 40% and 15% on succession, and the answer is $151, which is where the shares opened. Every ten points moved from the plateau to the analysts’ path adds about $7.

The discount for Huang is larger than the earnings damage we can model. Our weights take 10% off the value for succession. Certain drift takes off 13%. The shares stand 21% below where the chip index would have carried them, which is about the cost of an even bet between drift and disorder (22%). Either investors think the handover is very unlikely to hold, or part of the discount is a lower price for each dollar of earnings, which the Apple and Microsoft cases suggest.

What each path is worth, against the share price

A rough present value per share: earnings for the four years to January 2031 plus 10 times the last year’s, discounted at 10% (the ten-year Treasury yields about 5%). Earnings stand in for cash. The dashed line is about $165, the price on the morning of November 12. Analysts’ path: consensus to January 2029, then 12% and 6% growth. Plateau: revenue stops growing after the year to January 2028. Digestion: revenue falls 25%, then 10%, then recovers 10%.

The handover holdsDriftDisorder
0$50$100$150$200$250Analysts’ path, the handover holds: about $227 a share, 14.2× next year’s expected earningsAnalysts’ path, drift: about $196 a share, 12.3× next year’s expected earningsAnalysts’ path, disorder: about $159 a share, 10.0× next year’s expected earningsPlateau, the handover holds: about $148 a share, 9.3× next year’s expected earningsPlateau, drift: about $128 a share, 8.0× next year’s expected earningsPlateau, disorder: about $103 a share, 6.5× next year’s expected earningsDigestion, the handover holds: about $107 a share, 6.7× next year’s expected earningsDigestion, drift: about $93 a share, 5.8× next year’s expected earningsDigestion, disorder: about $74 a share, 4.7× next year’s expected earnings$165, Nov 12Analysts’ pathThe handover holds$227Drift$196Disorder$159PlateauThe handover holds$148Drift$128Disorder$103DigestionThe handover holds$107Drift$93Disorder$74
0$50$100$150$200$250Analysts’ path, the handover holds: about $227 a share, 14.2× next year’s expected earningsAnalysts’ path, drift: about $196 a share, 12.3× next year’s expected earningsAnalysts’ path, disorder: about $159 a share, 10.0× next year’s expected earningsPlateau, the handover holds: about $148 a share, 9.3× next year’s expected earningsPlateau, drift: about $128 a share, 8.0× next year’s expected earningsPlateau, disorder: about $103 a share, 6.5× next year’s expected earningsDigestion, the handover holds: about $107 a share, 6.7× next year’s expected earningsDigestion, drift: about $93 a share, 5.8× next year’s expected earningsDigestion, disorder: about $74 a share, 4.7× next year’s expected earnings$165, Nov 12Analysts’ pathThe handover holds$227Drift$196Disorder$159PlateauThe handover holds$148Drift$128Disorder$103DigestionThe handover holds$107Drift$93Disorder$74
All nine paths, year by year
DemandSuccessionEPS, Jan 2028EPS, Jan 2029EPS, Jan 2030EPS, Jan 2031Revenue, Jan 2031Value× next year’s EPS
Analysts’ pathThe handover holds$15.86$20.47$22.93$24.27$1.07T$22714.2×
Analysts’ pathDrift$15.81$19.60$20.65$20.49$954B$19612.3×
Analysts’ pathDisorder$15.27$17.74$17.38$15.97$804B$15910.0×
PlateauThe handover holds$15.86$15.08$15.01$14.94$692B$1489.3×
PlateauDrift$15.81$14.41$13.46$12.52$616B$1288.0×
PlateauDisorder$15.27$12.98$11.22$9.62$519B$1036.5×
DigestionThe handover holds$15.86$10.56$9.26$10.47$514B$1076.7×
DigestionDrift$15.81$10.06$8.23$8.71$457B$935.8×
DigestionDisorder$15.27$8.99$6.75$6.59$385B$744.7×

Earnings per share on each path

Pick a demand path. The dashed grey line is analysts’ consensus to January 2029, extended two years. The slider changes the multiple put on the last year’s earnings, which is where a view on growth after 2031 goes: at a 10% discount rate a multiple of 10 assumes none.

The handover holdsDriftDisorderAnalysts
$0$5$10$15$20$25Jan 2027Jan 2028Jan 2029Jan 2030Jan 2031The handover holds, year to Jan 2028: $15.86 a share on revenue of $692BThe handover holds, year to Jan 2029: $20.47 a share on revenue of $903BThe handover holds, year to Jan 2030: $22.93 a share on revenue of $1.01TThe handover holds, year to Jan 2031: $24.27 a share on revenue of $1.07TDrift, year to Jan 2028: $15.81 a share on revenue of $692BDrift, year to Jan 2029: $19.60 a share on revenue of $876BDrift, year to Jan 2030: $20.65 a share on revenue of $941BDrift, year to Jan 2031: $20.49 a share on revenue of $954BDisorder, year to Jan 2028: $15.27 a share on revenue of $678BDisorder, year to Jan 2029: $17.74 a share on revenue of $822BDisorder, year to Jan 2030: $17.38 a share on revenue of $840BDisorder, year to Jan 2031: $15.97 a share on revenue of $804BHolds$24.27Drift$20.49Disorder$15.97
$0$5$10$15$20$25Jan ’27Jan ’28Jan ’29Jan ’30Jan ’31The handover holds, year to Jan 2028: $15.86 a share on revenue of $692BThe handover holds, year to Jan 2029: $20.47 a share on revenue of $903BThe handover holds, year to Jan 2030: $22.93 a share on revenue of $1.01TThe handover holds, year to Jan 2031: $24.27 a share on revenue of $1.07TDrift, year to Jan 2028: $15.81 a share on revenue of $692BDrift, year to Jan 2029: $19.60 a share on revenue of $876BDrift, year to Jan 2030: $20.65 a share on revenue of $941BDrift, year to Jan 2031: $20.49 a share on revenue of $954BDisorder, year to Jan 2028: $15.27 a share on revenue of $678BDisorder, year to Jan 2029: $17.74 a share on revenue of $822BDisorder, year to Jan 2030: $17.38 a share on revenue of $840BDisorder, year to Jan 2031: $15.97 a share on revenue of $804BHolds$24.27Drift$20.49Disorder$15.97
The handover holds
$227
14.2× next year’s expected earnings; +37% against $165
Drift
$196
12.3× next year’s expected earnings; +19% against $165
Disorder
$159
10.0× next year’s expected earnings; −4% against $165
The assumptions behind each path
PathRevenue, years to Jan 2028–31Gross marginOperating cost
Analysts’ path$692B, $903B, $1.01T, $1.07T72.5%, the middle of Nvidia’s 72–73%$45B, $54B, $60B, $65B
Plateau$692B, $692B, $692B, $692B1.5 points lower from the second year$45B, $48B, $50B, $52B
Digestion$692B, $519B, $467B, $514B4, 5 and 4 points lower$45B, $45B, $43B, $44B
The handover holdsNo changeNo change$1.5B a year more
Drift0, −3%, −7%, −11%0, −0.5, −1.5, −2.5 points$3B a year more
Disorder−2%, −9%, −17%, −25%−0.5, −2, −4, −5.5 points$5–6B a year more

What multiple

On next year’s expected earnings of $15.91 a share, Nvidia traded at 15.0 times at the record, 10.9 on Wednesday, 9.5 at Thursday’s open and 10.4 at $165. LSEG’s 12-month measure, about 12, is the lowest since November 2012. Analysts’ targets averaged $327 a week ago, 20.6 times. The ones cut this week sit at $200 to $225, 12.6 to 14.1 times. Bernstein halved its multiple from about 25 to 12.7 without changing a forecast and called the shares “almost absurdly cheap” while advising against buying in size. The challenger gets three times the multiple: AMD closed Monday at 31 times its expected 2027 earnings.

Each multiple is a statement about a path. At a 10% discount rate and no growth after 2031, 14.2× is the analysts’ path with a clean handover. 12.3× is the analysts’ path with drift, which is where the sell side has reset. About 10 is the analysts’ path with disorder, or a plateau with a clean handover, which is where the market is. 8.0× and below is a plateau with drift or worse, and under 7 needs a digestion. Twenty needs growth after 2031: a new market of the kind Huang found three times, in games, in data centers and in networking. That part of the multiple left with him, and no successor gets it back by being competent. On our weights the answer is 9.5×, against 10.4× in the market.

The Tim Cook case is arithmetic, and it is available. Analysts expect $327B and $452B of free cash flow in the next two fiscal years, 8.2% and 11.4% of the market value at $165. Spending 60% of it on stock at an average of $200 would retire about 9.7% of the shares in two years, which adds as much to earnings per share as drift takes away by January 2030 (10%). A finance chief can run that, and this one already does. (President Trump said on Thursday that Cook himself should take the job, Yahoo Finance reported.) It works only if the earnings arrive, and it does nothing for the next architecture. The part of Cook’s record that does not transfer is the customer. Apple sold to consumers; about half of Nvidia’s data center revenue comes from a few hyperscalers that design chips of their own.

Who else is exposed

The companies that fell furthest on Thursday were Nvidia’s dependants. In the first hour or so CoreWeave was down about 12%, IREN 10% and Nebius 16% or more, against Nvidia’s 5%. Broadcom rose about 4.5% and AMD 2.8%; William Blair upgraded AMD. TSMC fell 2%.

The AI clouds exist because Nvidia chose to supply and back them. Four of the eight clouds it named first for Vera Rubin are neoclouds (pack 016), and customers other than the hyperscalers are now nearly half of its data center revenue, $40B against $49B last quarter, and grew twice as fast in it. CoreWeave owes $46.9B, pays 2.2 times its adjusted operating income in interest and saw its bonds yield 15.08% in October (W.076). What is signed stays signed, including Nvidia’s promise to buy its unsold capacity. What changes is the next deal. A new backstop needs an approval nobody is placed to give, and Kress said in August that Nvidia means its chips to go to customers with investment-grade credit or with a backer that has it. The reporting behind the inquiry centres on a Southeast Asian customer (W.054), so checks on who buys will tighten first for buyers of that kind. One offset: if Nvidia’s cadence slips, the chips these companies own stay current for longer (pack 024).

Among the labs OpenAI is the most exposed and Anthropic the least. OpenAI has the unsigned $100B, the $105B guarantee behind its Ohio campus and an operating loss larger than its revenue last quarter (W.079). Anthropic is raising its own money this month and has most of its compute on other chips.

Broadcom and AMD gain a customer base with more reason to dual-source, but not more chips to sell. Both say demand exceeds what they can supply. Share moves only as fast as TSMC and the memory makers allot capacity, and Nvidia’s orders for 2027 are placed. TSMC and the memory makers sell the wafer either way.

Does total investment fall? Not by much on the arithmetic. The five largest hyperscalers will spend about $800B this year and $1.3T next, by Nvidia’s own count, from their cash flow and the bond market (pack 001). The support at risk is the unsigned $240B, spread over several years; UBS’s $50B is 4% of next year’s hyperscaler spending. Output is capped by supply, so a chip a lab cannot finance goes to a hyperscaler that can. What changes is who gets the chips, and what lenders charge the ones who lose them. The Fed’s Bowman put AI-related debt above $800B this year (W.090). Some of the riskiest of it leans on Nvidia’s guarantees and promises to buy.

The first hours of trading on November 12

Share-price change from Wednesday’s close, %, as reported by the outlets in the table below between the open and about 10:50 a.m. in New York. The readings were taken at different times and moved while this was written. Nvidia opened 13.1% lower and is shown at about $165. CoreWeave had risen 27% the day before on its results, and Nebius also said its 2026 revenue would land at the low end of its range.

−20%−15%−10%−5%0+5%+10%Broadcom: +3.8% to +5.3% across reportsAMD: +2.0% to +2.8%TSMC (US shares): −2.0%Intel: −2.6% to −3%Micron: −2.9% to −5.8%Nvidia: opened −13.1%, low −14.3%, −5.0% at 10:51 a.m.IREN: −9.8%CoreWeave: −12% to −13.6%, after +27% the day beforeNebius: −16% to −20%; it also guided to the low end of its 2026 revenue rangeBroadcom+4.5%AMD+2.8%TSMC (US shares)−2.0%Intel−3.0%Micron−3.0%Nvidia−5.0%IREN−9.8%CoreWeave−12.0%Nebius−16.0%
−20%−15%−10%−5%0+5%+10%Broadcom: +3.8% to +5.3% across reportsAMD: +2.0% to +2.8%TSMC (US shares): −2.0%Intel: −2.6% to −3%Micron: −2.9% to −5.8%Nvidia: opened −13.1%, low −14.3%, −5.0% at 10:51 a.m.IREN: −9.8%CoreWeave: −12% to −13.6%, after +27% the day beforeNebius: −16% to −20%; it also guided to the low end of its 2026 revenue rangeBroadcom+4.5%AMD+2.8%TSMC−2.0%Intel−3.0%Micron−3.0%Nvidia−5.0%IREN−9.8%CoreWeave−12.0%Nebius−16.0%
The readings
CompanyShownAs reported
Broadcom+4.5%+3.8% to +5.3% across reports
AMD+2.8%+2.0% to +2.8%
TSMC (US shares)−2.0%−2.0%
Intel−3.0%−2.6% to −3%
Micron−3.0%−2.9% to −5.8%
Nvidia−5.0%opened −13.1%, low −14.3%, −5.0% at 10:51 a.m.
IREN−9.8%−9.8%
CoreWeave−12.0%−12% to −13.6%, after +27% the day before
Nebius−16.0%−16% to −20%; it also guided to the low end of its 2026 revenue range

What to watch

  • Nov 17. Nvidia’s results. Its guide was $108B, plus or minus 2%. What matters is whether the new management repeats the outlook for about 70% growth next year, and what happened to the $279B of supply on order.
  • Nov 18. The closed briefing three House chairmen asked Huang for. Three China chip bills are in the Senate’s draft defense bill.
  • This month. Anthropic’s IPO, where Nvidia was down for up to $10B; the preliminary $100B for OpenAI; and whether the financing platforms sign with Nvidia’s backstop.
  • Next months. Who gets the job. Intel took seven months and kept its finance chief; an engineer from inside is the nearest thing to Apple’s or TSMC’s handover. Press accounts mention Kress herself and Ian Buck, who built Nvidia’s CUDA software, from inside, and chip executives at Apple, Arm and AMD from outside. Departures among the 36 people who reported to Huang would be the first sign of disorder.
  • Any day. Huang’s shares. He held 870.6M in March, 3.58% of the company, about $144B at $165. He has not said what he will do next.
  • March 2027. The first GTC without him, and whether Rubin Ultra is on schedule.

What this is anchored on

ItemData pointSource
The handoverHuang resigned as president, chief executive and director, effective immediately; Kress interim chief executive and still finance chief; Jones the first board chair; internal and external candidates; results still due November 17Nvidia, Nov 12
The reporting before itThe board’s inquiry of November 8 and the reports of November 1106.ai, W.054 and W.087
Share pricesDaily closes June 1 to November 5 (Yahoo Finance, as collected for pack 023); $186.64, $178.67, $168.89 and $173.73 on November 6 to 1106.ai, W.087
Share pricesNovember 12: open $150.99, low $148.80Robinhood, Nov 12
Share pricesDown as much as 14%, then about $161 at 10:11 a.m. ET; IREN −9.8%CoinDesk, Nov 12
Share prices$165.05, down 5.00%, at 10:51 a.m. ET; fell more than 13% in early trading; the president’s remark about Tim CookYahoo Finance live blog, Nov 12
Chip indexPHLX Semiconductor Index 9,390.25 on November 6 (W.066); about 10,560 on November 11, 17% above its November 5 low; Nvidia lost about $190B from November 5 to 11 while TSMC, Broadcom and AMD each gained about $250BYahoo Finance, Nov 12
Analysts’ estimatesRevenue $411.7B and $692.2B, earnings per share $9.31 and $15.91, for the years to January 2027 and 2028; 57 analysts, with next year’s revenue from $507B to $779B; mean price target $327.14Yahoo Finance, fetched Nov 6
Analysts’ estimatesYear to January 2029: revenue $903.2B, earnings per share $20.52; free cash flow $190.2B, $326.8B and $451.7B for the three yearsMarketScreener, Oct 23
ResultsQuarter to July 26: revenue $96.2B, Data Center $89.0B, gross margin 75%; first-half free cash flow $69.9B, repurchases $39.0B; outlook $108B plus or minus 2%; Vera Rubin in full productionNvidia, Aug 26
OutlookRevenue growth of about 70% in the year to January 2028, limited by supply at least through that year; customers’ forecasts point to demand roughly doubling; gross margin 71–72% in the January quarter and 72–73% next year; lab demand supported by Nvidia’s balance sheet about a quarter of next year’s business; nearly $50B invested in frontier labs; hyperscale revenue $49B and all other data center revenue $40BNvidia’s August 26 call, transcript via Webull
CommitmentsThe filing’s three tables: $279B of supply and capacity among $366B of future commitments, $56B of additional commitments, $108.5B of guarantees, $530.5B in all; supply was $119B a quarter earlierFourWeekMBA, on the 10-Q
Commitments$99B of stakes in 229 private and 13 public companies; a preliminary agreement for $100B of OpenAI equity in ten installments; Huang’s statement that Nvidia could backstop up to a quarter of the $500B platforms; talks with Nscale; CoreWeave’s $6.3B orderHunterbrook, Nov 6
CommitmentsThe $105B guarantee, entered in August for the Ohio campus OpenAI will rent, ends if the tenant earns a satisfactory credit rating; $25B of notes sold in June; CoreWeave’s order runs to April 13, 2032Cape Fear Advisors, Aug 27
CommitmentsSupply commitments $16.1B, then $95.2B, at the last two fiscal year-ends; $92B due in the rest of this fiscal year and $87B in the nextBarchart, via Yahoo Finance, Sep 2
Buyback$150B added on September 28, $235B remaining, to be used through the year to January 2028Nvidia, Sep 28
Thursday’s reportingNvidia set to invest up to $10B beside the IPO; about 60 direct reports; the tally of six conduct exits; Bernstein’s and Yorkville’s notesYahoo Finance live blog, Nov 12
AnalystsBernstein to market-perform, $400 to $200, its multiple from about 25.4 to 12.7 on unchanged forecasts; Baird to neutral, $500 to $200investingLive, Nov 12
AnalystsOppenheimer’s downgrade and its warning on departures; Stifel $205, Citi $225; UBS on a pause in Nvidia’s funding taking about $50B out for a timeInvesting.com, Nov 12
Thursday’s movesCoreWeave −13.6%, Nebius −20%, AMD +2%; Nvidia at about 12 times 12-month forward earnings, the lowest since November 2012, per LSEGReuters, via MarketScreener, Nov 12
Thursday’s movesBroadcom +3.8% at 9:50 a.m. ET, AMD +2%, TSMC −2%, CoreWeave −12%, Nebius −16% to −19%, Micron and Intel about −3%Yahoo Finance, Nov 12
Thursday’s movesAMD +2.8% and Broadcom +4.5% after the open; William Blair’s upgrade of AMDInvesting.com, Nov 12
Organization36 direct reports in October 2025, down from 55, per an internal chart seen by Business InsiderTipRanks, Oct 16, 2025
OrganizationNames mentioned as possible successors, a roundup of press reportsKorea Economic Daily, via Bloomingbit, Nov 12
OrganizationElon Musk’s remark that it would be an honour to hire HuangNewsquawk, Nov 12
OrganizationStaff turnover of 2.7% in fiscal 2024Sherwood, Aug 29, 2024
BoardDirectors, tenure and ages; Jones a director since 1993Nvidia, 2026 proxy statement
BoardThe risk factors name no individual; they say Nvidia is highly dependent on its longstanding executive team and list a failure of succession planning as a riskNvidia, annual report for fiscal 2026, as hosted by Fortune
TSMCIts largest customer was 19% of 2025 revenue, NT$726.9B, from 12%; read as NvidiaAsia Economy, Mar 9, on TSMC’s annual report
TSMCMorris Chang’s memoir says he offered Huang the top job at TSMC in 2013Reuters, via The Star, Nov 29, 2024
TSMCHuang’s 1997 letter to Morris Chang began the partnership; Nvidia was among TSMC’s five largest customers within a few yearsBenzinga, Feb 2025
TSMCAdvanced-packaging demand of about 2.7M wafers in 2027, Nvidia about 45%Morgan Stanley, via KuCoin, Jul 8
AllocationLarry Ellison’s account of asking Huang for chips over dinnerFortune, Sep 16, 2024
RoadmapSix Vera Rubin chips taped out at TSMC, as Huang said on a visit to TaiwanNotebookcheck, Aug 24, 2025
RoadmapRubin Ultra on the Kyber rack in 2027; Feynman with the Rosa CPU in 2028; a new architecture every yearTweakTown, on GTC 2026
BenchmarkTokens a second per megawatt on DeepSeek V4 Pro at 100 tokens a second per user, interpolated between measured points; Vera Rubin on pre-release softwareSemiAnalysis InferenceX, Sep 14
AMDQuarterly revenue and Data Center revenue; fourth-quarter guidance of about $17B06.ai, W.004, from AMD’s releases
AMDData Center up about 50% in the fourth quarter; revenue growth above 80% in 2027 with data center more than 80% of it; first Helios revenue in the third quarter; the weekend portAMD’s November 3 call, transcript via Motley Fool
AMDClosed at $508.58 on November 9; analysts expect $16.30 a share in 2027 (Yahoo Finance, November 6)06.ai, W.066
AMD27.3% of server processors by units and 41% by revenue in the second quarter of 2025, per Mercury ResearchTom’s Hardware, Aug 14, 2025
BroadcomAI revenue of $58B in fiscal 2026, about $115B in 2027 and $230B in 2028 with supply secured; six custom-chip customers; the financing vehicle with Apollo and Blackstone; Tan’s comparison with Vera RubinBroadcom’s September call, transcript via Motley Fool
AnthropicIts seven largest disclosed compute contracts06.ai, W.001, from its prospectus
CoreWeaveDebt of $46.9B, interest 2.2 times adjusted operating income; bonds at 15.08% in October06.ai, W.076 and pack 002
AppleAfter hours on August 24, 2011, the shares fell about 5% to $357, from a close near $376; market value nearly $350BCNN Money, Aug 24, 2011
AppleRecord close of $702.10 on September 19, 2012; $392.05 on April 18, 2013Macworld, Apr 19, 2013
AppleRevenue, gross margin, quarterly earnings per share, net income and share counts, fiscal 2010 to 2023Apple, annual and quarterly reports
AppleAn analyst’s 2007 estimate that losing Jobs could take a quarter off Apple’s valueFortune, Aug 25, 2011
MicrosoftMarket value $604B in January 2000 and $269B in August 2013; $1,000 became $767 with dividends (FactSet)AP, via Phys.org, Aug 2013
MicrosoftRevenue about $23B to $77.9B and net income $9.4B to $21.9B, fiscal 2000 to 2013BuzzFeed News, Aug 2013
IntelSwan made permanent after a seven-month search, having said he was not a candidateFortune, Jan 31, 2019
IntelA six-month delay to its 7nm process; the shares closed 16% lower and AMD’s nearly 17% higherCNN, Jul 24, 2020
HPThe largest fall in six years after Hurd resigned; the finance chief as interimBloomberg, Aug 9, 2010
LucentCustomer financing commitments of $8.1B, about 24% of a year’s revenueTomasz Tunguz, Oct 3, 2025

Method

Prices. About $165 is the price at about 10:50 a.m. in New York on November 12; it had moved between $148.80 and about $165 since the open. Market value is price times about 24.1B shares, the count on the cover of the latest quarterly filing. Next year’s earnings are analysts’ consensus for the fiscal year to January 2028, $15.91 a share, from Yahoo Finance on November 6; the year to January 2029, $20.52, is from MarketScreener on October 23. Neither had been revised for Thursday’s news.

The chip index. $186.64 × (10,560 ÷ 9,390.25) = $209.89. The November 11 index level is read from Yahoo Finance’s chart, about 17% above the November 5 low, and is approximate. Nvidia is itself a large part of the index, which makes the gap look smaller than it is; some of the index’s rise was rivals gaining at Nvidia’s expense, which makes it look larger. The index’s move on November 12 is not included.

The cushion. Demand roughly doubling is taken as 2 × this year’s expected $411.7B, against $692.2B expected for next year: 1 − 692.21 ÷ 823.3 = 15.9%. A quarter of $692.2B is $173.1B.

Commitments. We did not read the filing itself; the tables are as transcribed by FourWeekMBA, Hunterbrook and Cape Fear Advisors, which agree. “For customers” is the guarantees ($108.5B), the AI-cloud agreements ($36B), the leases Nvidia expects to reassign ($20B) and equity commitments ($25B): $189.5B. The unsigned items are as reported and are maxima or minima, so their $240B sum is an order of magnitude, not a forecast.

Scenarios. Earnings per share on each path are analysts’ figures scaled by modelled operating income: revenue × gross margin − operating cost, with the analysts’ path at 72.5% and the costs in the table under the explorer. The analysts’ path with no succession effect reproduces their consensus to January 2029 and is extended at 12% and 6%. The share count is held flat, as it is in the consensus, so buybacks are not in the scenario figures. Value = Σ EPS ÷ 1.1t for the four years, with the first ending 1.2 years out, plus 10 × the last year’s EPS, discounted the same way. It leaves out the quarter now under way, net cash and the $99B of stakes, together about $8 a share. The paths and the weights are ours; they were set before the values were computed and have not been tuned to the share price.

Precedents. Apple’s trailing earnings are the four quarters to June 2011 ($4.64, $6.43, $6.40, $7.79) and to March 2013 ($9.32, $8.67, $13.81, $10.09), on a close of about $376.18 on August 24, 2011 and $392.05 on April 18, 2013, before later share splits. Per-share figures for 2012 and 2023 are split-adjusted. AMD’s 2027 data center figure is 80% of 1.8 times its 2026 revenue of $52.2B, which is three reported quarters plus the fourth-quarter guide; both 80% figures are floors AMD gave. Anthropic’s split treats its Google and Amazon contracts as largely on those companies’ own chips, which is our reading, not a figure in its prospectus.

Not covered. The inquiry’s findings, any legal or regulatory cost to Nvidia, and what Huang does next. Any of them could matter more than everything above.